Contract Splitting Pattern

Multiple similar contracts to the same contractor/DEO just under a threshold in a short window.

This is a statistical anomaly or indicator worth examining β€” not proof of wrongdoing, fraud, or corruption against any person.

Indicator: 5 contracts awarded to JELSIE CONST & SUPPLY by the same office started within 1 days, each between β‚±42.5M and β‚±50M (just under the β‚±50M threshold), with 5 in the same municipality. It is possible these are separate projects at different locations within the city, as part of a coordinated flood control program.

Public record entityConstruction of Pumping Station at Estero dela Reina, Barangay 55, Tondo, Manila City
LocationCITY OF MANILA (METROPOLITAN MANILA), CITY OF MANILA, National Capital RegionContract 23OE0072
Amountβ‚±47,747,381.33 sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list β€” not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Pumping Station at Estero dela Reina, Barangay 55, Tondo, Manila City23OE0072Flood control100%July 16, 2024July 16, 2024β€”completedsumbong source

Start: February 16, 2023 Β· Source fetched October 21, 2026

Rule Definition

β‰₯3 contracts within 120 days, each 85–100% of β‚±50M threshold, similar titles.

Triggering Data & citations

Cluster of contracts just under procurement threshold with similar scope

{
  "deo": "North Manila District Engineering Office",
  "contractId": "23OE0072",
  "contractor": "JELSIE CONST & SUPPLY",
  "windowDays": 120,
  "clusterSize": 5,
  "thresholdPhp": 50000000,
  "contractCostPhp": 47747381.33,
  "averageTitleSimilarity": 0.7699739235234484
}

Possible Innocent Explanations

  • Legitimate multi-lot procurement
  • Different sites under same program