Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23DQ0076 was awarded at 99.97% of its ABC. Across its 21 recorded contracts, GRAIA CONST CORP was awarded at ≥99.5% of ABC 21 times (100.0%), versus 70.4% for flood-control contracts overall. Contractors may consistently bid near the ABC to remain competitive while maximizing their potential profit.

Public record entityConstruction of River Bank Protection Works along Imus River at Brgy Salinas, Bacoor City, Cavite
LocationBACOOR CITY (CAVITE), CAVITE, Region IV-AContract 23DQ0076
Amount₱98,973,894.3899.97% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of River Bank Protection Works along Imus River at Brgy Salinas, Bacoor City, Cavite23DQ0076Flood control100%March 27, 2024March 4, 2024No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: May 3, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "Cavite 3rd District Engineering Office",
  "ratio": 0.9997363477669919,
  "abcPhp": 98999995.95,
  "threshold": 0.995,
  "contractId": "23DQ0076",
  "contractor": "GRAIA CONST CORP",
  "contractCostPhp": 98973894.38
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteCity of Bacoor
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Man-Yi 2024Trami 2024Ewiniar 2024
Hazard exposure
Active fault12.5 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)lowUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgeinundated only at SSA4 (>5 m surge)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.