Awards Very Close to the Budget Ceiling

Contract cost is at or above 99.5% of ABC from Sumbong.

This is a statistical anomaly or indicator worth examining — not proof of wrongdoing, fraud, or corruption against any person.

Indicator: contract 23A00130 was awarded at 99.98% of its ABC. Across its 14 recorded contracts, RODEKOM GEN CONST AND ENT was awarded at ≥99.5% of ABC 14 times (100.0%), versus 70.4% for flood-control contracts overall. It is possible that the contractor consistently bids very close to the ABC to maximize their chances of winning within legal limits.

Public record entityConstruction of Flood Control Structure along Aringay River, Barangay Halog East - Halog West, Tubao, La Union
LocationTUBAO (LA UNION), LA UNION, Region IContract 23A00130
Amount₱144,720,639.7099.98% of approved budget (ABC) sumbong source

Only contractors and government agencies named in public procurement records are shown. Private individuals are not named.

Satellite before / after

Loading satellite imagery…

Named in this indicator? Respond or report an error · Corrections policy

Project completion

Schedule fields from DPWH transparency portal records and the Sumbong sa Pangulo flood-control list — not inferred beyond those columns.

Reported complete (DPWH): 1Ongoing: 0Delayed: 0Status unknown: 0
ProjectProg.Target endActual endDays lateStatus
Construction of Flood Control Structure along Aringay River, Barangay Halog East - Halog West, Tubao, La Union23A00130Flood control100%January 13, 2024November 13, 2023No target date from DPWH, so lateness cannot be computedcompletedsumbong source

Start: February 14, 2023 · Source fetched October 21, 2026

Rule Definition

ContractCost / ABC ≥ 0.995 using metadata.abc and contract cost fields.

Triggering Data & citations

Contract cost is at or above 99.5% of approved budget for contract (ABC)

{
  "deo": "La Union 2nd District Engineering Office",
  "ratio": 0.9997971654576856,
  "abcPhp": 144750000,
  "threshold": 0.995,
  "contractId": "23A00130",
  "contractor": "RODEKOM GEN CONST AND ENT",
  "contractCostPhp": 144720639.7
}

Possible Innocent Explanations

  • Accurate cost estimating
  • Single qualified bid at market rate
  • ABC set equal to engineer’s estimate

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)La UnionTubaoHalog East
Storms whose wind field reached it
Fung-Wong 2025Fengshen 2025Matmo 2025Kajiki 2025Co-May 2025
Hazard exposure
Active fault1.5 km to mapped traceGEM Foundation (Philippines catalogue within GEM Global Active Faults)Flood (100-yr rain)highUP NOAH Center / DOST-PAGASA (Project NOAH)Landslideoutside mapped landslide zonesUP NOAH Center / UP NIGS (Project NOAH)Storm surgenot inundated even at SSA4 (>5 m)UP NOAH Center / DOST-PAGASA (Project NOAH)Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.