Barangay
Nakar
Nakar, San Guillermo, Isabela, Region II (Cagayan Valley). Rural. Population 1,097 (2024 POPCEN).
PSGC 0203128013 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Nakar
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
Not yet linked to Nakar itself. This shows the municipality figure for San Guillermo.
88 records · ₱1,551,266,832.15
5 placed at San Guillermo level itself; the rest in LGUs under it.
- Oo1: Ensure Safe and Reliable National Road System: Network Development Program - Construction of By-Pass and Diversion Roads - Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route, San Guillermo, Package 1, Isabela₱115,523,684.02 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 1: Ensure Safe and Reliable National Road System: Network Development Program: Construction of By-Pass and Diversion Roads - Alicia-Angadanan-San Guillermo-Cauayan City-Naguilian Alternate Route, Package 1, Isabela₱99,411,902.71 · 2023 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Sinalugan Flood Control Drainage Structure Sta. 0+000₱96,483,397.79 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Villa Remedios Flood Control Drainage Structure Sta.0₱93,609,810.00 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Villa Teresita Flood Control Drainage Structure Sta.0₱93,609,802.50 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction / Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Villa Teresita Flood Control Drainage Structure Sta.0₱93,609,800.00 · 2025 · medium confidence (project coordinates inside the barangay boundary)
How linked: 83 by project coordinates inside the barangay boundary; 4 by project coordinates inside the city/municipality boundary; 1 by project title names the place.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Nakar itself. This shows the municipality figure for San Guillermo.
1 record · ₱147,814,548.91
- Municipality of San Guillermo, Isabela₱147,814,548.91 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Nakar itself. This shows the province figure for Isabela.
56,727 records · ₱206,158,132,724.98
56,674 placed at Isabela level itself; the rest in LGUs under it.
- Isabela₱206,158,132,724.98 · 56,674 awards · high confidence (area of delivery is this province only)
- Batangas, Bukidnon, Cagayan, Camarines Sur, Cotabato, Davao del Sur, Isabela, Pampanga, Tarlac₱112,839,000.00 · 2 awards · low confidence (area of delivery lists several provinces)
- Basilan, Isabela, Sulu, Tawi-Tawi, Zamboanga del Norte, Zamboanga del Sur, Zamboanga Sibugay₱38,348,411.40 · 1 awards · low confidence (area of delivery lists several provinces)
- Iloilo, Isabela₱3,146,289.62 · 36 awards · low confidence (area of delivery lists several provinces)
- Aurora, Cagayan, Ilocos Sur, Isabela₱2,584,900.00 · 1 awards · low confidence (area of delivery lists several provinces)
- Aurora, Bataan, Cagayan, Ilocos Norte, Ilocos Sur, Isabela, La Union, Marinduque, Nueva Vizcaya, Occidental Mindoro, Oriental Mindoro, Palawan, Pangasinan, Quirino, Romblon, Zambales₱2,281,640.00 · 1 awards · low confidence (area of delivery lists several provinces)
How linked: 56,674 by area of delivery is this province only; 53 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
Not yet linked to Nakar itself. This shows the municipality figure for San Guillermo.
10 records · ₱93,857,143.00
3 placed at San Guillermo level itself; the rest in LGUs under it.
- Construction of Evacuation Center in Brgy. Nakar, San Guillermo, Isabela₱30,000,000.00 · 2022 · high confidence (location columns in the DBM release)
- Lgsf_gef₱12,857,143.00 · 2023 · high confidence (location columns in the DBM release)
- Concreting of Farm to Market Road₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Farm to Market Road₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Concreting of Farm to Market Road₱10,000,000.00 · 2026 · high confidence (location columns in the DBM release)
- Assistance to Indigent Individuals Or Families - Food Assistance/Rice Distribution Project₱5,000,000.00 · 2026 · high confidence (location columns in the DBM release)
How linked: 10 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
1 record · ₱3,000,000.00
- Construction of Multi-Purpose Building, Brgy. Nakar, San Guillermo, Isabela₱3,000,000.00 · 2020 · medium confidence (GAA line text names the place)
How linked: 1 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
No published flags are linked to Nakar itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, San Guillermo.
- High Concurrent Workload for One ContractorDalcon ConstContractor: Dalcon Const
- High Concurrent Workload for One ContractorJwu Const and SupplyContractor: Jwu Const and Supply
- High Concurrent Workload for One ContractorEgb Const Corp Formerly: Egb ConstContractor: Egb Const Corp Formerly: Egb Const
- Awards Very Close to the Budget CeilingConstruction of Flood Control and Drainage Structure Section 2, Barangay Palawan, San Guillermo, IsabelaContractor: Jwu Const and Supply
Contractors on linked DPWH projects
None linked to Nakar itself; showing San Guillermo.
- JWU CONST AND SUPPLY21 projects · ₱860,769,967.18
- DANYSONS CONST AND DEVELOPMENT CORP FORMERLY: DANYSONS CONST1 project · ₱99,411,902.71
- JC PALOMO CONST7 projects · ₱96,327,306.79
- ADVANCED FOUNDATION CONST SYSTEMS CORP1 project · ₱66,228,566.38
- SIFFU ROCKS CONST10 projects · ₱60,379,685.53
- BDA JR CONST11 projects · ₱55,105,073.87
- C R DOMINGO CONST AND POWER DEVELOPMENT INC FOR C R DOMINGO CONST INC1 project · ₱50,969,284.40
- CAMBERWELL CONST AND SUPPLIES4 projects · ₱43,808,305.84
- DALCON CONST3 projects · ₱34,940,434.54
- J3P CONST AND DEVELOPER CORP4 projects · ₱24,643,526.79

Share this page
The card shows the public record facts and a QR code back to this page.
QR codes for Nakar
Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.
