Barangay
Holjogon
Holjogon, Mobo, Masbate, Region V (Bicol Region). Rural. Population 549 (2024 POPCEN).
PSGC 0504113008 · Source: PSA, PSGC 3Q 2026 Publication Datafile
Public records linked to Holjogon
Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.
DPWH infrastructure projects
Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal
Not yet linked to Holjogon itself. This shows the municipality figure for Mobo.
54 records · ₱1,046,693,369.86
1 placed at Mobo level itself; the rest in LGUs under it.
- Construction of Poblacion East Seawall, Milagros, Masbate₱96,500,000.00 · 2022 · medium confidence (project coordinates inside the barangay boundary)
- Organizational Outcome 2: Protect Lives and Properties Against Major Floods - Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage Systems - Construction of Flood Control Structure Along BañAdero River, Mobo, Mas₱96,499,945.09 · 2025 · medium confidence (project coordinates inside the barangay boundary)
- Flood Management Program - Construction/Maintenance of Flood Mitigation Structures and Drainage System - Construction/Improvement/Rehabilitation of BañAdero River Flood Control System, Sta.2+779 - Sta.3+110 (Downstream, Left Side), Sta.3+700 - Sta.4+007₱96,229,874.32 · 2020 · medium confidence (project coordinates inside the barangay boundary)
- Convergence and Special Support Program - Special Road Fund - Motor Vehicle User'S Charge (Mvuc) As Per R.A. 11239 - Rehabilitation/Reconstruction/Upgrading of Damaged Paved Roads Along Masbate - Cataingan - Placer Rd (S00005mt) K0006+060 - K0007+141, K00₱73,259,855.07 · 2024 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Concrete Road - Concreting of Junction National Road - Barangay Tabuc - Pinamalatican - Polot Road, Mobo, Masbate₱49,428,893.15 · 2019 · medium confidence (project coordinates inside the barangay boundary)
- Construction of Flood Control System Along BañAdero River, Sta. 4+222.00 - Sta. 4+550.00 (Upstream, Right Side), Mobo, Masbate₱49,000,000.00 · 2023 · medium confidence (project coordinates inside the barangay boundary)
How linked: 53 by project coordinates inside the barangay boundary; 1 by project title names the place.
Contracts this LGU awarded (PhilGEPS)
PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices
Not yet linked to Holjogon itself. This shows the municipality figure for Mobo.
1 record · ₱11,496,844.26
- Municipality of Mobo, Masbate₱11,496,844.26 · high confidence (the LGU itself is the buyer)
How linked: 1 by the LGU itself is the buyer.
PhilGEPS awards delivered here (all agencies)
Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices
Not yet linked to Holjogon itself. This shows the province figure for Masbate.
14,641 records · ₱69,010,548,491.53
14,256 placed at Masbate level itself; the rest in LGUs under it.
- Masbate₱69,010,548,491.53 · 14,256 awards · high confidence (area of delivery is this province only)
- Albay, Camarines Norte, Camarines Sur, Catanduanes, Masbate, Sorsogon₱176,181,300.57 · 161 awards · low confidence (area of delivery lists several provinces)
- Albay, Camarines Sur, Masbate, Sorsogon₱105,154,378.00 · 31 awards · low confidence (area of delivery lists several provinces)
- Albay, Camarines Norte, Masbate₱102,726,190.19 · 1 awards · low confidence (area of delivery lists several provinces)
- Albay, Camarines Norte, Camarines Sur, Masbate, Sorsogon₱73,068,254.65 · 90 awards · low confidence (area of delivery lists several provinces)
- Catanduanes, Masbate, Sorsogon₱35,818,786.00 · 15 awards · low confidence (area of delivery lists several provinces)
How linked: 14,256 by area of delivery is this province only; 385 by area of delivery lists several provinces.
Local Government Support Fund releases
DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS
1 record · ₱2,500,000.00
- Installation of 25 Units of Streetlights at Barangay Holjogon₱2,500,000.00 · 2024 · high confidence (location columns in the DBM release)
How linked: 1 by location columns in the DBM release.
GAA budget lines naming this place
General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act
Not yet linked to Holjogon itself. This shows the municipality figure for Mobo.
27 records · ₱700,428,000.00
21 placed at Mobo level itself; the rest in LGUs under it.
- Construction/Improvement/Rehabiilitation of BañAdero River Flood Control System, Mobo, Masbate₱100,000,000.00 · 2020 · high confidence (GAA line text names the place)
- Construction of Flood Control Structure Along BañAdero River, Mobo, Masbate₱100,000,000.00 · 2025 · high confidence (GAA line text names the place)
- Concreting of Junction National Road - Barangay Tabuc - Pinamalatican - Polot Road, Mobo, Masbate₱50,000,000.00 · 2019 · high confidence (GAA line text names the place)
- Construction of BañAdero Flood Control (Downstream to Upstream), Mobo, Masbate₱50,000,000.00 · 2019 · high confidence (GAA line text names the place)
- Construction of Flood Control System Along Ba±Adero River, Sta. 4+358.00 - Sta. 4+574.50 (Upstream, Both Sides), Mobo, Masbate₱50,000,000.00 · 2023 · high confidence (GAA line text names the place)
- Construction of Flood Control System Along Marintoc River, Mobo, Masbate₱50,000,000.00 · 2018 · high confidence (GAA line text names the place)
How linked: 27 by GAA line text names the place.
COA annual audit reports
Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.
Published anomaly flags
Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.
No published flags are linked to Holjogon itself: none of the DPWH projects, PhilGEPS awards or contractors matched to it carry a reviewed flag yet. Showing the nearest parent LGU that has some, Masbate.
- Contractor Concentration (Flood Control)Centerways Const and Development IncContractor: Centerways Const and Development Inc
- Duplicate or Near-Duplicate ProjectsConstruction of Flood Mitigation Structure at Bito River (Upstream), Brgy. Magkaipit, San Fernando, MasbateContractor: Kyla Const Supply
- Duplicate or Near-Duplicate ProjectsConstruction of Flood Mitigation Structure, Bito River (Upstream), Barangay Magkaipit, San Fernando, MasbateContractor: Alxm Const & Dev'T Corp Formerly:Alxm Const
- Contractor Concentration (Flood Control)Hgg Builders & SupplyContractor: Hgg Builders & Supply
- Duplicate or Near-Duplicate ProjectsConstruction of Flood Control Concrete Revetment, Gaid River, Barangay Gaid, Dimasalang, MasbateContractor: Hkp Const and Supply / A3 Const & Supply
- Duplicate or Near-Duplicate ProjectsConstruction of Flood Mitigation Structure, Bito River (Upstream), Barangay Corbada, San Fernando, MasbateContractor: A3 Const & Supply
Contractors on linked DPWH projects
None linked to Holjogon itself; showing Mobo.
- YAKAL CONST3 projects · ₱241,728,535.09
- HKP CONST AND SUPPLY2 projects · ₱116,023,397.41
- RED DIAMOND CONST AND SUPPLY CORP FORMERLY: RED DIAMOND CONST1 project · ₱96,499,945.09
- SPRING STAR CONST AND SUPPLY2 projects · ₱84,708,893.15
- MARABE GEN CONST12 projects · ₱74,415,674.17
- CL CARANDANG CONST AND SUPPLY CORP FORMERLY: CL CARANDANG ENT4 projects · ₱68,347,877.46
- GACT ENT3 projects · ₱59,709,284.95
- A3 CONST & SUPPLY / EJ CANTORIA CONST & SUPPLY1 project · ₱49,000,000.00
- A C RIVERO DEVELOPMENT CORP1 project · ₱46,476,183.77
- HI-TONE CONST1 project · ₱35,148,268.02

Share this page
The card shows the public record facts and a QR code back to this page.