MARABE GEN CONST is listed as a company organization in Philippine public procurement records on this site, with 93 linked DPWH project(s) totaling about ₱834,921,183.91. Recorded delivery grade C (from public DPWH project records — not a finding of wrongdoing).
MARABE GEN CONST
CGrade by Love the Philippines based on public DPWH project records, capped by published COA, Ombudsman or other official and news reports. Not a government rating or blacklist. How grades workRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 93
- Total value
- ₱834,921,183.91
- Published flags
- 0
- Region
- Masbate 2nd DEO · Region V
Public Record Grade
A transparent, data-derived summary of reported public records for MARABE GEN CONST — not an accusation or finding of wrongdoing.
Score: 79.70 / 100 · Projects in sample: 93 · As of Oct 28, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 63.9/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 63.9
- lateCompletedProjects
- 45
- onTimeCompletedProjects
- 35
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 85
- pastTargetOngoingProjects
- 5
- undatedCompletedProjectsExcluded
- 8
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 93
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 93
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 93
- componentScore
- No data for this figure; the component is excluded, not scored
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 93
- componentScore
- No data for this figure; the component is excluded, not scored
- linkedObservations
- 0
Computed automatically from public DPWH project records and the reviewed anomaly flags on them, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
Showing 50 of 86 geotagged projects (largest by contract value) — Open full map · Download projects (CSV)
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES, IMPAPANAN BR. (B00030MT) ALONG MASBATE-CATAINGAN-PLACER RD.25FJ0082 · ₱56,343,137.28 · mapped
- OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, BRIDGE PROGRAM- WIDENING OF PERMANENT BRIDGES, DIVISORIA BR. (B00060MT) ALONG BUENAVISTA- KAWAYAN RD.25FJ0066 · ₱39,523,439.73 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - JUNCTION NATIONAL ROAD SITIO CALULOD - B. TITONG - UBONGAN DACU SECTION LEADING TO V23FI0025 · ₱39,200,000.00 · mapped
- LOCAL PROGRAM - CONSTRUCTION OF DILG BUILDING , MASBATE PROVINCIAL FIELD OFFICE, MASBATE CITY22FI0055 · ₱35,280,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW PERMANENT BRIDGES - LOOC BR. ALONG JCT. TAWAD - BALUD RD., BALUD, MASBATE23FI0029 · ₱29,400,000.00 · mapped
- ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - REPLACEMENT OF PERMANENT WEAK BRIDGES - LUMBANG BR. (B00089MT) ALONG MASBATE - MILAGROS RD. (PHASE 2), MASBATE CITY24FI0009 · ₱29,399,895.22 · mapped
- CONSTRUCTION OF ELEMENTARY AND SECONDARY CLASSROOMS UNDER THE DEPED'S CY 2019 BASIC EDUCATIONAL FACILITIES FUND: 2STY 8CL VERDIDA-SABRIDO NHS, MASBATE19FJ0047 · ₱26,352,697.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD- CONCRETING OF ROAD, JCT. NATIONAL ROAD- BRGY. LOOC ROAD, MANDAON, MASBATE, LENGTH= 4.572 LANE KM (2.286 KM)19FI0024 · ₱24,480,004.31 · mapped
- BRIDGE - WIDENING OF PERMANENTBRIDGES - AMOROY BRIDGE II (B00085MT) ALONG MASBATE - CATAINGAN - PLACER RD., K0017+879.80 - K0018+077.44, NET AREA = 103.032 SQ.M., MOBO, MASBATE20FI0033 · ₱19,599,944.03 · mapped
- BIP - PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III) - CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II IN THE MUNICIPALITY OF PLACER, MASBATE23FJ0063 · ₱19,599,367.60 · mapped
- BIP - PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III) - CONSTRUCTION OF VARIOUS SOLAR WATER SYSTEM LEVEL II IN THE MUNICIPALITY OF CATAINGAN, MASBATE23FJ0062 · ₱19,576,688.12 · mapped
- OO1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-SECONDARY ROADS, ROAD WIDENING-MASBATE-CATAINGAN-PLACER RD-K0068+000 - K0068+57121FJ0015 · ₱13,991,648.71 · mapped
- CONSTRUCTION OF 1 UNIT 2 STOREY 2 SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT USAB HIGH SCHOOL, MASBATE CITY18FI0115 · ₱11,802,699.47 · mapped
- CONSTRUCTION OF 1 UNIT 2 STOREY 2 ICT BUILDING (9.50M X 23.00M) AT USAB HIGH SCHOOL, MASBATE CITY18FI0114 · ₱11,579,418.16 · mapped
- CONSTRUCTION OF TWO(2) STOREY - FOUR(4) CLASSROOM SCHOOL BUILDING AT ANDRES CLEMENTE JR. NATIONAL HIGH SCHOOL.18FM0054 · ₱10,038,289.51 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF ROAD, JUNCTION NATIONAL ROAD - BARANGAY BALAWING, STA. 0+300 - STA. 0+600, NET LENGTH = 0.600 LANE KM. (0.300 KM), AROROY, MASBATE21FI0009 · ₱9,899,944.15 · mapped
- LOCAL INFRASTRUCTURE PROGRAM - CONCRETING OF ROAD, BARANGAY BATUILA - BANASE GABI, STA. 0+000 - STA. 0+118, NET LENGTH: 0.236 LANE KM (0.118 KM), BALENO, MASBATE21FI0022 · ₱9,899,905.93 · mapped
- BIP - PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III) - CONSTRUCTION OF VARIOUS WATER SYSTEM LEVEL II IN THE MUNICIPALITY OF ESPERANZA, MASBATE23FJ0068 · ₱9,800,666.36 · mapped
- NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - SECONDARY ROADS - JCT. MILAGROS - BALENO - LAGTA RD. (S00016MT), K0033+193 - K0033+307, MILAGROS, MASBATE22FI0017 · ₱9,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM(CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF BALENO, PROVINCE OF MASBATE23FI0055 · ₱9,800,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE /RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF BALUD, PROVINCE OF MASBATE23FI0054 · ₱9,800,000.00 · mapped
- BIP - PUBLIC WATER SUPPLY SYSTEM (LEVEL II OR III) - CONSTRUCTION OF VARIOUS WATER SYSTEM LEVEL II IN THE MUNICIPALITY OF PLACER, MASBATE23FJ0069 · ₱9,799,931.76 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF MILAGROS, PROVINCE OF MASBATE23FI0056 · ₱9,799,745.99 · mapped
- CSSP-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF ESPERANZA, PROVINCE OF MASBATE23FJ0067 · ₱9,693,899.18 · mapped
- CSSP-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF CATAINGAN, PROVINCE OF MASBATE23FJ0066 · ₱9,691,425.62 · mapped
- CSSP-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF PIO V. CORPUS, PROVINCE OF MASBATE23FJ0070 · ₱9,691,070.56 · mapped
- CSSP-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF DIMASALANG, PROVINCE OF MASBATE23FJ0065 · ₱9,690,976.78 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTOR S - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, MANDAON, MASBATE23FI0051 · ₱9,650,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, MASBATE CITY, MASBATE23FI0053 · ₱9,650,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY / SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, MOBO, MASBATE23FI0050 · ₱9,650,000.00 · mapped
- CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION / REHABILITATION OF WATER SUPPLY/ SEPTAGE AND SEWERAGE / RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, BALENO, MASBATE23FI0052 · ₱9,649,999.98 · mapped
- CSSP-CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS - WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM LEVEL II, CATAINGAN, MASBATE23FJ0064 · ₱9,649,711.08 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT SALVADOR AROLLADO, SR. MEM. HIGH SCHOOL, BALUD, MASBATE18FI0086 · ₱9,648,169.55 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT QUINYANGAN NATIONAL HIGH SCHOOL, BALUD, MASBATE18FI0090 · ₱9,591,664.93 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT LIBERATO P. TACURDA, SR. HIGH SCHOOL, BALUD, MASBATE18FI0088 · ₱9,561,418.87 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT SALVADOR AROLLADO, SR. MEM HIGH SCHOOL, BALUD, MASBATE18FI0085 · ₱9,518,314.29 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT PEDRO C. SESE SR. MEMORIAL HIGH SCHOOL, BALUD, MASBATE18FI0082 · ₱9,512,465.94 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT BRICCIO A. ANINANG SR. MEMORIAL HIGH SCHOOL, BALUD, MASBATE18FI0084 · ₱9,472,344.59 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT AROROY NATIONAL HIGH SCHOOL18FI0066 · ₱9,471,517.61 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT NABONGSORAN HIGH SCHOOL18FI0059 · ₱9,467,150.86 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT QUINYANGAN NATIONAL HIGH SCHOOL, BALUD, MASBATE18FI0089 · ₱9,463,001.03 · mapped
- CONSTRUCTION OF 1-STOREY 3-CLASSROOM SCHOOL BUILDING IN VICTORY INTEGRATED SCHOOL, BARANGAY VICTORY, BALUD, MASBATE24FI0071 · ₱9,452,500.00 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT LIBERATO P. TACURDA, SR. HIGH SCHOOL, BALUD, MASBATE18FI0087 · ₱9,433,562.30 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT PEDRO C. SESE, SR. MEM. HIGH SCHOOL, BALUD, MASBATE18FI0081 · ₱9,385,751.47 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT AROROY NATIONAL HIGH SCHOOL, AROROY, MASBATE18FI0075 · ₱9,351,794.70 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT BRICCIO A. ANINANG SR. MEM. HIGH SCHOOL, BALUD, MASBATE18FI0083 · ₱9,347,175.92 · mapped
- CONSTRUCTION OF 1-UNIT 2-STOREY 2-ICT BUILDING (9.50M X 23.00M) AT NABONGSORAN HIGH SCHOOL18FI0068 · ₱9,342,653.25 · mapped
- CONSTRUCTION OF 1 UNIT 2 STOREY 2 SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT CRISTETA BAGANO MEM. HIGH SCHOOL, MOBO, MASBATE18FI0107 · ₱9,299,089.40 · mapped
- CONSTRUCTION OF 1 UNIT 2 STOREY 2 SCIENCE LABORATORY BUILDING (9.50M X 23.00M) AT FLORO L. MEDINA MEMORIAL HIGH SCHOOL, MOBO, MASBATE18FI0105 · ₱9,190,540.30 · mapped
- CONSTRUCTION OF 1 UNIT 2 STOREY 2 ICT BUILDING (9.50M X 23.00M) AT CRISTETA BAGANO MEM. HIGH SCHOOL, MOBO, MASBATE18FI0106 · ₱9,171,803.88 · mapped
Equipment & capacity
PCAB license
No PCAB license is linked to this record. It may be a joint venture, a foreign firm, or a name we could not match. Search PCAB.
Government performance ratings (CPES)
No CPES evaluation lists this contractor's PCAB license in the GPPB releases we loaded (34th–41st).
Source: GPPB Constructors Performance Evaluation System reports. Matched by PCAB license number.
Equipment list
Not publicly available: submitted with bids to each agency; obtainable via FOI.
Bidders file a list of owned or leased equipment with their eligibility documents (RA 9184 IRR). Request it from the procuring agency at foi.gov.ph.
Across government
No PhilGEPS contract awards from other agencies matched to this name in the records loaded so far.
From PhilGEPS award notices; linked only where the awardee name matches this profile exactly after normalization. Shown for context; these awards do not affect the grade.
Watch this contractor
Get a weekly email when this organization changes: progress, new linked records or newly published anomaly flags.

Share this page
The card shows the public record facts and a QR code back to this page.
Bidding patterns
Pattern checks are being verified before publication. They look for win rotation, shared business addresses and shared principals among contractors, using PhilGEPS award notices and PCAB license records. Scope analyzed so far: 3,966,103 awards, 27,841 contractors and 16,785 procuring offices (data as of December 26, 2025) · Source: PhilGEPS.
Method, thresholds and breakdowns →