Bridges23FI0029

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW PERMANENT BRIDGES - LOOC BR. ALONG JCT. TAWAD - BALUD RD., BALUD, MASBATE

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW PERMANENT BRIDGES - LOOC BR. ALONG JCT. TAWAD - BALUD RD., BALUD, MASBATE is a DPWH-tracked public work in Masbate 2nd DEO, Region V. Reported contract value: ₱29,400,000.00. Status: Reported complete (DPWH). Contractor on record: MARABE GEN CONST. Figures trace to dpwh.

Masbate 2nd DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXIII-23-0021873 · ₱657,118 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23FI0029 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-04-27 → 2019-04-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    CY2023 · other

    Confirmed (exact contract ID) · score 1.00

    COA AAR source ↗

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - CONSTRUCTION OF NEW PERMANENT BRIDGES - LOOC BR. ALONG JCT. TAWAD - BALUD RD., BALUD, MASBATE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System along Bangon River, Sta. 0+000.00 - Sta. 0+067.00 (Downstream, Right Side and Left Side), Sta. 0+244.00 - Sta. 0+337.00 (Upstream, Right and Left Side), Aroroy, Masbate
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXIII-23-0021873

₱657,118.00 · FY2023

Released to Caraga Regional Science High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

93 projects · ₱834.9M total · 0 flags

4. Implementation

Contract Amount

₱29,400,000.00

Progress

Reported complete (DPWH)

Start Date

February 8, 2023

Target End

November 20, 2023

5. Audit

Confirmed (exact contract ID) · 100%

COA observation (CY2023 audit, Par. 1.40 Net overstatement of PPE accounts - P17,633,475,350.06). DPWH's action-plan response to this observation names Contract ID 23FI0029, p. 56. Excerpt: "namely: 23FI0029, JEV-2024-05-001858 dtd. Contract ID 5/1/2024 for Contract ID No. No. 20FI0036 23FI0036, JEV-2024-02-000252 dtd. and 22FI0043. 2/12/2024 for Contract ID No. 23FI0042, JEV-2024-04-001143 dtd."

CY2023 · p.56

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)MasbateMandaonLooc
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.