Barangay

Cosina

Cosina, Talakag, Bukidnon, Region X (Northern Mindanao). Rural. Population 3,455 (2024 POPCEN).

PSGC 1001320005 · Source: PSA, PSGC 3Q 2026 Publication Datafile

Public records linked to Cosina

Counts include this barangay and every LGU under it. Each record carries how it was linked and a confidence level; figures are as recorded by the source and exclude single amounts of ₱10B+ held for verification. They are not findings.

DPWH infrastructure projects

Contracts on the DPWH Transparency portal, placed by coordinates first. Source: DPWH Transparency portal

8 records · ₱207,074,259.05

  1. Access Roads and/Or Bridges From the National Road/S Leading to Major/ Strategic Public Building/S Facilities Jct. Cdo City-Dominorog-Camp Kibaritan Rd to Jct. Sh-Aglayan-Alanib-Ticalaan Rd (Aglayan -Basak) Talakag Section, Bukidnon, Package 1₱119,180,894.59 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  2. Construction of 2 Units 1 Storey 5 Classroom, Cosina Integrated School, Talakag, Bukidnon₱31,591,250.00 · 2024 · medium confidence (project coordinates inside the barangay boundary)
  3. Concreting of Brgy. Cosina to Batang Road Fmr Brgy. Cosina, Talakag, Bukidnon₱24,862,152.42 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  4. Rehabilitation of Municipal Water Supply System Barangay Cosina, Cacaon, Dagumbaan and Santo NiñO, Talakag, Bukidnon₱21,914,073.12 · 2025 · medium confidence (project coordinates inside the barangay boundary)
  5. Construction of Multi-Purpose Building Barangay Cosina, Talakag, Bukidnon₱2,970,000.00 · 2021 · medium confidence (project coordinates inside the barangay boundary)
  6. Construction of 1sty 2cl School Building With Toilet, Cosina Es, Cosina, Talakag, Bukidnon₱2,895,450.00 · 2017 · medium confidence (project coordinates inside the barangay boundary)

How linked: 8 by project coordinates inside the barangay boundary.

Contracts this LGU awarded (PhilGEPS)

PhilGEPS awards where the procuring entity is this LGU. Source: PhilGEPS award notices

Not yet linked to Cosina itself. This shows the municipality figure for Talakag.

1 record · ₱819,241,310.56

  1. Municipality of Talakag, Bukidnon₱819,241,310.56 · high confidence (the LGU itself is the buyer)

How linked: 1 by the LGU itself is the buyer.

PhilGEPS awards delivered here (all agencies)

Awards by any agency whose area of delivery is this province. PhilGEPS records delivery areas at province level only. Source: PhilGEPS award notices

Not yet linked to Cosina itself. This shows the province figure for Bukidnon.

61,259 records · ₱253,314,615,955.42

61,212 placed at Bukidnon level itself; the rest in LGUs under it.

  1. Bukidnon₱253,314,615,955.42 · 61,212 awards · high confidence (area of delivery is this province only)
  2. Batangas, Bukidnon, Cagayan, Camarines Sur, Cotabato, Davao del Sur, Isabela, Pampanga, Tarlac₱112,839,000.00 · 2 awards · low confidence (area of delivery lists several provinces)
  3. Bukidnon, Camiguin, Lanao del Norte, Misamis Occidental, Misamis Oriental₱36,487,769.40 · 5 awards · low confidence (area of delivery lists several provinces)
  4. Bohol, Bukidnon, Bulacan, Cagayan₱26,967,830.69 · 1 awards · low confidence (area of delivery lists several provinces)
  5. Batangas, Bukidnon, Cagayan, Camarines Sur, Cotabato, Davao del Sur, Pampanga, Tarlac₱9,570,790.00 · 4 awards · low confidence (area of delivery lists several provinces)
  6. Bataan, Batanes, Batangas, Benguet, Biliran, Bohol, Bukidnon, Bulacan, Cagayan, Camarines Norte₱8,259,635.30 · 1 awards · low confidence (area of delivery lists several provinces)

How linked: 61,212 by area of delivery is this province only; 47 by area of delivery lists several provinces.

Local Government Support Fund releases

DBM LGSF project releases by province, city/municipality and barangay. Source: DBM COMPASS

1 record · ₱4,000,000.00

  1. Rehabilitation of Farm to Market Road Phase 1₱4,000,000.00 · 2022 · high confidence (location columns in the DBM release)

How linked: 1 by location columns in the DBM release.

GAA budget lines naming this place

General Appropriations Act lines whose text ends in this city/municipality and province. Source: DBM General Appropriations Act

4 records · ₱40,000,000.00

  1. Rehabilitation of Municipal Water Supply System, Barangay Cosina, Cacaon, Dagumbaan, and Santo Nino, Talakag, Bukidnon₱25,000,000.00 · 2025 · medium confidence (GAA line text names the place)
  2. Construction of Solar Water System, Barangay Cosina, Talakag, Bukidnon₱10,000,000.00 · 2023 · medium confidence (GAA line text names the place)
  3. Construction of Multi-Purpose Building, Barangay Cosina, Talakag, Bukidnon₱3,000,000.00 · 2021 · medium confidence (GAA line text names the place)
  4. Construction of Water System, Brgy. Cosina, Talakag, Bukidnon₱2,000,000.00 · 2018 · medium confidence (GAA line text names the place)

How linked: 4 by GAA line text names the place.

COA annual audit reports

Not yet linked: the COA reports loaded so far cover national agencies only. LGU audit reports are published at coa.gov.ph.

Published anomaly flags

Patterns in the linked records that reviewers checked and published. A flag is a question worth asking, not a finding of wrongdoing.

See all 2 published flags

Contractors on linked DPWH projects

All 6 contractors on DPWH projects linked to Cosina and the LGUs under it. Click a column to sort.

Ven Ray Const CORP1₱119,180,894.592
Ebcon 52 Ventures INC2₱53,505,323.120
Lyd Const1₱24,862,152.420
E And H Const And Supply2₱4,776,403.010
Cagalawan Ent1₱2,970,000.000
Joan Const1₱1,779,485.910

Costs as recorded by DPWH; single amounts of ₱10B+ are held for verification and excluded. Flags count published automated anomalies on this contractor's projects or awards here, plus flags on the contractor itself; they are not findings.

Share card: Cosina

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

QR codes for Cosina

Print these or the flyer and post them in your barangay hall, market or school. Both use high error correction, so they still scan when partly worn.

Explore spending
Download SVG
Send evidence
Download SVG