EBCON 52 VENTURES INC is listed as a company organization in Philippine public procurement records on this site, with 31 linked DPWH project(s) totaling about ₱893,546,524.09. Recorded delivery grade C (pattern summary from public DPWH/PhilGEPS links — not a finding of wrongdoing).
EBCON 52 VENTURES INC
CRegistered business (company) — public records only; no personal data beyond the business name (Data Privacy Act).
- Projects
- 31
- Total value
- ₱893,546,524.09
- Published flags
- 0
- Region
- Bukidnon 3rd DEO · Region X
Licensed officers (PCAB)
- Junevar Delos Reyes Tupas · Authorized Managing Officer (PCAB license 43865) PCAB online license verification, 2026-10-22
Authorized Managing Officer as listed on the PCAB public licence register. The AMO is not necessarily an owner of the firm. Right of reply: contractors and named officers may request corrections.
Public Record Grade
A transparent, data-derived summary of reported public records for EBCON 52 VENTURES INC — not an accusation or finding of wrongdoing.
Score: 75.90 / 100 · Projects in sample: 31 · As of Oct 22, 2026 UTC
Thin public record coverage: several grade components had no data and were reweighted. Treat the letter grade as directional, not definitive.
Why this grade
- On-time delivery (dated DPWH completions)
Component score: 58.3/100 · Weight: 53%
- graceDays
- 30
- componentScore
- 58.3
- lateCompletedProjects
- 2
- onTimeCompletedProjects
- 20
- pastTargetPenaltyWeight
- 2
- scheduleAssessedProjects
- 29
- pastTargetOngoingProjects
- 7
- undatedCompletedProjectsExcluded
- 2
- Termination rate
Component score: 100/100 · Weight: 24%
- totalProjects
- 31
- componentScore
- 100
- terminatedProjects
- 0
- terminationRatePct
- 0
- Cost overruns vs approved budget (ABC)
Component score: 100/100 · Weight: 24%
- avgOverrunPct
- 0
- componentScore
- 100
- projectsWithAbcAndCost
- 31
- projectsOver110PctOfAbc
- 0
- Published anomaly indicators (AI-reviewed)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 31
- componentScore
- —
- flagsPerProject
- 0
- publishedV2Flags
- 0
- COA audit observations (linked)
No data — excluded and weight redistributed (no data never counts as a perfect score)
- projects
- 31
- componentScore
- —
- linkedObservations
- 0
Computed automatically from public DPWH, PhilGEPS and COA records, capped where official bodies or credible news outlets have published reports about linked projects. This Public Record Grade reflects reported data only — not a finding of wrongdoing, fraud, or poor performance as a moral judgment. Contractors may submit a right of reply. Right of reply form.
Right of reply — contractors may respond to published grades and indicators.
31 geotagged projects — Open full map
- CONSTRUCTION OF DIVERSION ROAD ALONG JCT SH (JCT BUDA-QUEZON-MANUTO- MINSAMONGAN-C HANDUMANAN-BALANGIGAY-TANDONG-SAN VICENTE- KIANGGAT-DANGCAGAN-JCT SH (QUEZON SECTION) PACKAGE 323K00174 · ₱173,937,922.92 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURES ALONG PANLIBATUHAN CREEK (TRIBUTARY TO PULANGUI RIVER), BRGY. POBLACION SECTION, VALENCIA CITY, BUKIDNON23K00180 · ₱92,066,302.96 · mapped
- CONSTRUCTION OF ROAD, BAUNGON-TALAKAG-LANTAPAN-MARAMAG ROAD (BARANGAY GUINOYURAN AND BARANGAY PANALSALAN SECTION) VALENCIA CITY, BUKIDNON25KN0028 · ₱60,645,252.99 · mapped
- ROAD WIDENING ALONG SAYRE HIGHWAY - K1456+467-K1457+268, MANOLO FORTICH, BUKIDNON23KC0047 · ₱56,935,000.00 · mapped
- REHABILITATION/RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE AND LANDSLIDE ALONG MISAMIS OR. -BUKIDNON - AGUSAN RD. - K1428+338-K1428+413, MALITBOG, BUKIDNON25KC0094 · ₱53,301,852.06 · mapped
- PAVING OF UNPAVED ROADS ALONG MIS. OR.-BUKIDNON-AGUSAN RD. K1460+000-K1460+173.50, MALITBOG, BUKIDNON23KC0111 · ₱49,387,735.00 · mapped
- ROAD WIDENING ALONG BARANDIAS-DOMINOROG RD. - K1610+(-219)-K1610+551, TALAKAG, BUKIDNON24KC0120 · ₱38,646,050.08 · mapped
- UPGRADING OF DRAINAGE STRUCTURE ALONG CDO PORT ROAD K1439+250, K1439+839 TO K1440+48524KD0013 · ₱38,111,053.96 · mapped
- CONSTRUCTION OF 2 UNITS 1 STOREY 5 CLASSROOM, COSINA INTEGRATED SCHOOL, TALAKAG, BUKIDNON24KC0105 · ₱31,591,250.00 · mapped
- CONSTRUCTION OF CONCRETE ROAD - NRJ CABAGOHAN-BINON-AN-EMBARCADERO-BOTONGON ROAD LEADING TO GIGANTES ISLANDS, CARLES, ILOILO21GH0047 · ₱29,399,985.98 · mapped
- ACCESS ROAD LEADING TO BEQUIBEL SHELL MIDDEN, BUTUAN CITY21ND0059 · ₱29,389,154.85 · mapped
- CONSTRUCTION OF MULTI PURPOSE BUILDING IN BARANGAY CUGMAN, CAGAYAN DE ORO24KD0027 · ₱26,971,048.55 · mapped
- CONSTRUCTION/IMPROVEMENT OF ALAE RIVER, BRGY. BUGO, CAGAYAN DE ORO CITY25KD0035 · ₱24,132,587.65 · mapped
- BONBON- LIBERTAD BYPASS ROAD, BUTUAN CITY, AGUSAN DEL NORTE21N00056 · ₱23,149,103.34 · mapped
- REHABILITATION OF MUNICIPAL WATER SUPPLY SYSTEM BARANGAY COSINA, CACAON, DAGUMBAAN AND SANTO NIÑO, TALAKAG, BUKIDNON25KC0052 · ₱21,914,073.12 · mapped
- ROAD WIDENING ALONG SAYRE HIGHWAY - K1489 + 609 - K1490 + 106, IMPASUG-ONG, BUKIDNONIMPASUG-ONG, BUKIDNON 2ND LD22KA0021 · ₱17,635,680.29 · mapped
- CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG BUBUNAWAN RIVER BUBUNAWAN RIS, BAUNGON, BUKIDNON25KC0073 · ₱14,302,976.36 · mapped
- CONCRETING OF BRGY. POBLACION TO BRGY. LUPIAGAN FMR, BRGY. LUPIAGAN, SUMILAO, BUKIDNON23KC0122 · ₱11,940,000.00 · mapped
- CONCRETING OF BRGY. INDULANG TO BRGY. COLAWINGON FMR PHASE III BRGY. INDULANG AND BRGY. COLAWINGON, TALAKAG, BUKIDNON21KC0106 · ₱11,940,000.00 · mapped
- ROAD WIDENING ALONG SAYRE HIGHWAY K1464+382-K1464+508, K1464+667-K1464+820, MANOLO FORTICH, BUKIDNON22KC0002 · ₱10,232,333.90 · mapped
- CONSTRUCTION/IMPROVEMENT/REHABILITATION OF BRGY. STO. NINO FMR, TALAKAG, BUKIDNON22KC0098 · ₱9,950,000.00 · mapped
- CONSTRUCTION/IMPROVEMENT/REHABILITATION OF DAGUMBAAN FMR, TALAKAG, BUKIDNON22KC0097 · ₱9,950,000.00 · mapped
- CONSTRUCTION OF 2-STOREY 10-CLASSROOM SCHOOL BUILDING IN SAN ISIDRO ELEMENTARY SCHOOL (PHASE 1), BARANGAY SAN ISIDRO, TALAKAG, BUKIDNON24KC0117 · ₱9,950,000.00 · mapped
- CONSTRUCTION OF MULTI-PURPOSE BUILDING, PHASE 1 BARANGAY ALAE, MANOLO FORTICH, BUKIDNON24KC0088 · ₱9,900,000.00 · mapped
- CONSTRUCTION OF DRAINAGE, BARANGAY MACASANDIG, CAGAYAN DE ORO CITY (PHASE 2)25KD0041 · ₱9,535,368.65 · mapped
- CONSTRUCTION OF STO. NIÑO-SAN ISIDRO ROAD BARANGAY STO. NIÑO, SAN ISIDRO, TALAKAG, BUKIDNON24KC0100 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF PAT-PAT WATER SYSTEM RESERVOIR BARANGAY SALIMBALAN, BAUNGON, BUKIDNON24KC0089 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF WATER SYSTEM, BARANGAY LIGURON, TALAKAG, BUKIDNON24KC0046 · ₱4,950,000.00 · mapped
- CONSTRUCTION OF BARANGAY ROAD IN BARANGAY MABUNGA, BAUNGON, BUKIDNON23KC0141 · ₱4,825,000.00 · mapped
- CONSTRUCTION (COMPLETION) OF WATER SUPPLY SYSTEM BARANGAY SAN ISIDRO, TALAKAG, BUKIDNON25KC0037 · ₱4,808,765.73 · mapped
- CONSTRUCTION OF MULTI PURPOSE BUILDING BARANGAY BALUBAL, CAGAYAN DE ORO CITY23KD0012 · ₱4,148,025.70 · mapped
