Buildings and Facilities16OD0066

IMPROVEMENT OF TB DOTS IN UGONG HEALTH CENTER BRGY. UGONG, VALENZUELA CITY

IMPROVEMENT OF TB DOTS IN UGONG HEALTH CENTER BRGY. UGONG, VALENZUELA CITY is a DPWH-tracked public work in Metro Manila 3rd DEO, National Capital Region. Reported contract value: ₱1,906,697.85. Status: Reported complete (DPWH). Contractor on record: C L MORALES CONST AND TRADING. Figures trace to dpwh.

Metro Manila 3rd DEO, National Capital Region
Region: National Capital Region
No pre-construction imagery available — Esri Wayback has no distinct capture before the project start date at this location.

Follow the peso

3 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2016 · ₱40,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXII-16-0024977 · ₱556,377 · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,906,698 · C.L. MORALES CONSTRUCTION AND TRADING

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: IMPROVEMENT OF TB DOTS IN UGONG HEALTH CENTER BRGY. UGONG, VALENZUELA CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Wall along Tullahan River, Brgy. Ugong, Valenzuela City 2nd LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXII-16-0024977

₱556,377.00 · FY2016

Released to Soccsksargen Centers for Health Development Allot (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

16OD0066

₱1,906,697.85 · C.L. MORALES CONSTRUCTION AND TRADING

Award / contract ref: 16OD0066

4. Implementation

Contract Amount

₱1,906,697.85

Progress

Reported complete (DPWH)

Start Date

January 11, 2017

Target End

March 11, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
National Capital Region (NCR)
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.