Bridges24DK0035

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - ABIAWIN BR. (B02439LZ) ALONG FAMY-REAL-INFANTA-DINAHICAN PORT RD

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - ABIAWIN BR. (B02439LZ) ALONG FAMY-REAL-INFANTA-DINAHICAN PORT RD is a DPWH-tracked public work in Quezon 1st DEO, Region IV-A. Reported contract value: ₱4,899,762.32. Status: Reported complete (DPWH). Contractor on record: N T SOTELO CONST AND SUPPLY CORP. Figures trace to dpwh.

Quezon 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱8,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24DK0035 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-06-18 → 2021-06-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - BRIDGE PROGRAM - RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES - ABIAWIN BR. (B02439LZ) ALONG FAMY-REAL-INFANTA-DINAHICAN PORT RD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱8,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structures, Brgy. Libjo, Infanta, Quezon
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Quezon 1st DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

91 projects · ₱1.3B total · 0 flags

Other projects by this contractor

No sat.

CSSP - SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - SIPAG - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD, POBLACION - BUSDAK, PATNANUNGAN, QUEZON

Quezon 1st DEO, Region IV-A

2025₱76.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING (SPORT COMPLEX), SINILOAN, LAGUNA

Laguna 1st DEO, Region IV-A

2022₱74.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - POLILLO-PANUKULAN-BURDEOS ROAD LEADING TO BEACHES AND TOURISM SPOTS, QUEZON (PANUKULAN SIDE)

Quezon 1st DEO, Region IV-A

2022₱67.5M
Reported complete (DPWH)
No sat.

CSSP -CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - POLILLO - PANUKULAN - BURDEOS ROAD LEADING TO BEACHES AND TOURISM SPOTS, POLILLO, QUEZON

Quezon 1st DEO, Region IV-A

2025₱61.9M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-INFANTA BYPASS ROAD,QUEZON

Quezon 1st DEO, Region IV-A

2023₱53.1M
Reported complete (DPWH)
No sat.

CSSP - CONSTRUCTION/ IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP) - POLILLO - PANUKULAN - BURDEOS ROAD LEADING TO BEACHES AND TOURISM SPOTS, POLILLO, QUEZON

Quezon 1st DEO, Region IV-A

2024₱53.1M
Reported complete (DPWH)
View all 91 projects →

4. Implementation

Contract Amount

₱4,899,762.32

Progress

Reported complete (DPWH)

Start Date

February 26, 2024

Target End

April 27, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)QuezonInfantaAbiawin
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.