Buildings and Facilities18CB0060

LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BANAWANG, BAGAC, BATAAN

LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BANAWANG, BAGAC, BATAAN is a DPWH-tracked public work in Bataan 2nd DEO, Region III. Reported contract value: ₱4,701,493.65. Status: Reported complete (DPWH). Contractor on record: LUCK-WELL CONST DEV'T CORP FORMERLY: LUCKWELL CONST. Figures trace to dpwh.

Bataan 2nd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROIII-18-0014605 · · release to the district office, not itemized per project

    Possible match · score 0.79

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18CB0060 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-01-03 → 2021-10-29

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: LOCAL INFRASTRUCTURE PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-CONSTRUCTION OF MULTI-PURPOSE BUILDING, BRGY. BANAWANG, BAGAC, BATAAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Maintenance of Flood Mitigation Structures and Drainage Systems, Talisay River, Boulevard, Brgy. Bagumbayan, Balanga City, Bataan
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROIII-18-0014605

₱0.00 · FY2018

Released to Division of Bataan (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

27 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE & SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRA PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BR. FR. THE NAT'L. RDS./S LEADING TO MAJOR/STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF ACCESS RD, BRGY. QUINAWAN, BAGAC TO BRGY. BIAAN, MARIVELES, BA

Region III, Region III

2023₱193.0M
Past target date (DPWH On-Going)
No sat.

LOCAL PROGRAM-CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS AND BRIDGES-LOCAL ROADS, CONSTRUCTION OF ROAD (PHASE I), BARANGAY QUINAWAN, BAGAC, BATAAN

Region III, Region III

2021₱193.0M
Reported complete (DPWH)
No sat.

CONVERGENCE & SPL. SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJS. ALLEVIATING GAPS (SIPAG)-ACCESS RDS. &/OR BRIDGES FR. THE NAT'L. RD./S LEAD. TO MAJ./STRATEGIC PUBLIC BLDGS./FACILITIES-CONST. OF ACCESS ROADS BRGY. QUINAWAN, BAGAC TO BRGY. BIAAN, MARI

Region III, Region III

2024₱189.2M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION OF SEAPORT, BALANGONAN, JOSE ABAD SANTOS, DAVAO OCCIDENTAL

Davao Occidental DEO, Region XI

2019₱144.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REPAIR/REHABILITATION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS-LOCAL ROADS & BRIDGES-LOCAL ROADS-CONSTRUCTION OF ACCESS ROAD (PHASE I), BARANGAY QUINAWAN, BAGAC, BATAAN

Region III, Region III

2021₱144.7M
Reported complete (DPWH)
No sat.

FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, UMAGOL RIVER, UPSTREAM, SEGMENT VR-2, BAGAC, BATAAN

Bataan 3rd DEO, Region III

2025₱118.2M
Past target date (DPWH On-Going)
View all 27 projects →

4. Implementation

Contract Amount

₱4,701,493.65

Progress

Reported complete (DPWH)

Start Date

February 21, 2018

Target End

July 10, 2018

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BataanBagacBanawang
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.