GAA 2025 DA FMR25CG0142No coordinates published by DPWH

CONCRETING OF SITIO PANDAPUG, BRGY. SAN MIGUEL FARM-TO-MARKET ROAD, BRGY. SAN MIGUEL, SAN SIMON, PAMPANGA

CONCRETING OF SITIO PANDAPUG, BRGY. SAN MIGUEL FARM-TO-MARKET ROAD, BRGY. SAN MIGUEL, SAN SIMON, PAMPANGA is a DPWH-tracked public work in Pampanga 1st DEO, Region III. Reported contract value: ₱4,722,149.85. Status: Reported complete (DPWH). Contractor on record: EDDMARI CONST. Figures trace to dpwh.

Pampanga 1st DEO, Region III

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region III

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-25-0012434 · ₱21,916,207 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱4,722,150 · EDDMARI CONSTRUCTION AND TRADING

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2025-03-06 → 2025-03-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF SITIO PANDAPUG, BRGY. SAN MIGUEL FARM-TO-MARKET ROAD, BRGY. SAN MIGUEL, SAN SIMON, PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Pampanga River, (Downstream-Left Bank), Barangay Consuelo, Macabebe, Pampanga
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-25-0012434

₱21,916,207.00 · FY2025

Released to Davao City 3rd District Engineering Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

25CG0142 - Concreting of Sitio Pandapug, Brgy. San

₱4,722,149.85 · EDDMARI CONSTRUCTION AND TRADING

Contractor

B

181 projects · ₱8.8B total · 0 flags

Other projects by this contractor

No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 5 AND PACKAGE 6, PROVINCE OF PAMPANGA

Region III, Region III

2023₱243.2M
Past target date (DPWH On-Going)
No sat.

NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 4, PROVINCE OF PAMPANGA

Region III, Region III

2021₱214.2M
Reported complete (DPWH)
No sat.

LOCAL INFRASTRUCTURE PROGRAM (LIP) -NATIONAL ROADS, CONSTRUCTION OF APALIT BYPASS ROAD CONNECTING TWO PROVINCES IN REGION III, BULACAN AND PAMPANGA

Region III, Region III

2017₱198.0M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, LUBAO-GUAGUA-MINALIN-STO. TOMAS ROAD (STO. TOMAS-MINALIN SECTION), PACKAGE 2, PROVINCE OF PAMPANGA

Region III, Region III

2020₱193.0M
Reported complete (DPWH)
No sat.

CONST./REP/REHAB./IMPR'VT. OF VARIOUS INFRA INCLUDING LOCAL PROJECTS-LOCAL ROADS & BRIDGES-LOCAL ROADS-REHAB./IMPR'VT. (UPGRADING & WIDENING TO 4-LANES WITH CONCRETE SLOPE PROTECTION) OF SAN MATIAS-STO. ROSARIO PAU ROAD, STO. TOMAS, PAMPANGA

Region III, Region III

2021₱193.0M
Reported complete (DPWH)

REHABILITATION/RESTORATION OF DETERIORATED DIKES/ERODED RIVERBANKS ALONG PAMPANGA RIVER INCLUDING CANDABA CUT-OFF CHANNEL, CANDABA, PAMPANGA (INLCUDING ROW), CANDABA AND SAN SIMON, PAMPANGA

Flood Control Management Cluster, Central Office

2018₱174.3M
Reported complete (DPWH)
View all 181 projects →

4. Implementation

Contract Amount

₱4,722,149.85

Progress

Reported complete (DPWH)

Start Date

May 30, 2025

Target End

November 20, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaSan Simon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.