Buildings and Facilities16FO0054No coordinates published by DPWH

CONSTRUCTION OF CY 2016 BEFF (BATCH 5), ONE (1) UNIT, ONE (1) CLASSROOM SCHOOL BUILDING AT BASAG ELEMENTARY SCHOOL, LIGAO CITY

CONSTRUCTION OF CY 2016 BEFF (BATCH 5), ONE (1) UNIT, ONE (1) CLASSROOM SCHOOL BUILDING AT BASAG ELEMENTARY SCHOOL, LIGAO CITY is a DPWH-tracked public work in Albay 3rd DEO, Region V. Reported contract value: ₱1,029,013.08. Status: Reported complete (DPWH). Contractor on record: GROSIN CONST. Figures trace to dpwh.

Albay 3rd DEO, Region V

DPWH did not publish coordinates for this project. Location estimated from the project title (barangay level); satellite images may not show the exact site.

Region: Region V

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-16-0001029 · ₱42,869 · release to the district office, not itemized per project

    Possible match · score 0.67

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16FO0054 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2014-09-27 → 2014-09-27

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CY 2016 BEFF (BATCH 5), ONE (1) UNIT, ONE (1) CLASSROOM SCHOOL BUILDING AT BASAG ELEMENTARY SCHOOL, LIGAO CITY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Oas Flood Control Structure, Calsada Section, Albay
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-16-0001029

₱42,869.00 · FY2016

Released to Division of Sorsogon (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

32 projects · ₱133.0M total · 0 flags

4. Implementation

Contract Amount

₱1,029,013.08

Progress

Reported complete (DPWH)

Start Date

August 14, 2016

Target End

November 8, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayCity of Ligao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.