Buildings and Facilities23NE0132

CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. DOÑA HELEN, LIBJO, DINAGAT ISLANDS

CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. DOÑA HELEN, LIBJO, DINAGAT ISLANDS is a DPWH-tracked public work in Dinagat Islands DEO, Region XIII. Reported contract value: ₱4,824,819.82. Status: Reported complete (DPWH). Contractor on record: RADIAN CONST AND SUPPLY. Figures trace to dpwh.

Dinagat Islands DEO, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱10,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROXI-23-0024784 · ₱45,085 · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23NE0132 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-06-16 → 2025-06-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. DOÑA HELEN, LIBJO, DINAGAT ISLANDS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure at Paragua Br. I, Barangay General Aguinaldo, Libjo, Dinagat Islands
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROXI-23-0024784

₱45,085.00 · FY2023

Released to 0000000 University of - Southeastern Philippines (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

210 projects · ₱1.3B total · 0 flags

4. Implementation

Contract Amount

₱4,824,819.82

Progress

Reported complete (DPWH)

Start Date

January 10, 2024

Target End

July 7, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Dinagat IslandsLibjoDoña Helen
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.