Roads20CD0103

NETWORK DEVELOPMENT - ROAD WIDENING GEN. ALEJO SANTOS HIGHWAY - K0065+000 - K0065+848

NETWORK DEVELOPMENT - ROAD WIDENING GEN. ALEJO SANTOS HIGHWAY - K0065+000 - K0065+848 is a DPWH-tracked public work in Bulacan 2nd DEO, Region III. Reported contract value: ₱16,227,597.17. Status: Reported complete (DPWH). Contractor on record: R2A CONST. Figures trace to dpwh.

Bulacan 2nd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROI-20-0002525 · ₱720,731 · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20CD0103 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-05 → 2025-04-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (widening)

₱19,136,317 per km= 0.6x the Region III median (n=98)

Contract cost ₱16,227,597 ÷ 0.848 km read from the DPWH title (“K0065+000 - K0065+848”; K-post / station range length). National percentile: 7. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: NETWORK DEVELOPMENT -  ROAD WIDENING GEN. ALEJO SANTOS HIGHWAY - K0065+000 -  K0065+848

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Const.of Flood Control Structures along San Miguel-Sibul Road at Sibul River San Miguel, Bulacan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROI-20-0002525

₱720,731.00 · FY2020

Released to Regional Office - I (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

95 projects · ₱1.7B total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERSCONSTRUCTION OF WATERWAY ALONG IMUS RIVER,

Cavite 1st DEO, Region IV-A

2025₱116.9M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE FACILITY (IMUS PUBLIC MARKET), PHASE I, IMUS CITY, CAVITE

Cavite 1st DEO, Region IV-A

2023₱99.0M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMBASIC INFRASTRUCTURE PROGRAM (BIP)BIP - MULTI-PURPOSE BUILDINGS/ FACILITIES TO SUPPORT SOCIAL SERVICESCONSTRUCTION OF MULTI-PURPOSE FACILITY, IMUS CITY, CAVITE (PHASE 2)

Cavite 1st DEO, Region IV-A

2024₱99.0M
Past target date (DPWH On-Going)

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAM CONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS CONST OF REVETMENT ALONG CAÑAS RIVER, BRGY SANTOL, PHASE V,TANZA, CAVITE

Cavite 1st DEO, Region IV-A

2024₱95.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAMSUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIESCONCRETING OF DAANG HARI TO PATINDIG ARAW

Cavite 1st DEO, Region IV-A

2023₱67.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF 4STY 20CL SCHOOL BUILDING AT CAYETANO TOPACIOELEMENTARY SCHOOL, IMUS CITY

Cavite 1st DEO, Region IV-A

2018₱60.2M
Reported complete (DPWH)
View all 95 projects →

4. Implementation

Contract Amount

₱16,227,597.17

Progress

Reported complete (DPWH)

Start Date

November 26, 2020

Target End

April 25, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)BulacanAngatMarungko
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.