Roads23NH0103

REPAIR/RECONSTRUCTION OF ROADS WITH SLOPE PROTECTION ALONG SURIGAO-DAVAO COASTAL ROAD,K1285+831 - K1285+868 AT BRGY. BALIBADON, CORTES, SURIGAO DEL SUR

REPAIR/RECONSTRUCTION OF ROADS WITH SLOPE PROTECTION ALONG SURIGAO-DAVAO COASTAL ROAD,K1285+831 - K1285+868 AT BRGY. BALIBADON, CORTES, SURIGAO DEL SUR is a DPWH-tracked public work in Surigao del Sur 1st DEO, Region XIII. Reported contract value: ₱28,135,473.11. Status: Reported complete (DPWH). Contractor on record: DDS BUILDERS. Figures trace to dpwh.

Surigao del Sur 1st DEO, Region XIII
Region: Region XIII

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVII-23-0027032 · ₱10,268,343 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 23NH0103 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-25 → 2025-09-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REPAIR/RECONSTRUCTION OF ROADS WITH SLOPE PROTECTION ALONG SURIGAO-DAVAO COASTAL ROAD,K1285+831 - K1285+868 AT BRGY. BALIBADON, CORTES, SURIGAO DEL SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Tago River, Brgy. Libas Gua, San Miguel, Surigao del Sur
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVII-23-0027032

₱10,268,343.00 · FY2023

Released to Siquijor State College (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Possible match · 67%

SJADS INFRA 22-15

₱199,593.25 · DDS BUILDERS

Contractor

B

262 projects · ₱1.1B total · 0 flags

4. Implementation

Contract Amount

₱28,135,473.11

Progress

Reported complete (DPWH)

Start Date

September 18, 2023

Target End

August 11, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del SurCortesBalibadon
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.