Roads16PJ0070

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) ALONG JCT. POTIA - MT. PROVINCE BDRY ROAD, - K0434+395 - K0438+444, K0439+800 - K0447+1

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) ALONG JCT. POTIA - MT. PROVINCE BDRY ROAD, - K0434+395 - K0438+444, K0439+800 - K0447+1 is a DPWH-tracked public work in Ifugao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱24,894,310.62. Status: Reported complete (DPWH). Contractor on record: BUGANI CONST AND ENT INC. Figures trace to dpwh.

Ifugao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2017 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROVIII-17-0025641 · ₱1,925,000 · release to the district office, not itemized per project

    Possible match · score 0.63

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16PJ0070 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2015-05-13 → 2025-06-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED NATIONAL ROADS INCLUDING DRAINAGE BASED ON PAVEMENT MANAGEMENT SYSTEM/HIGHWAY DEVELOPMENT AND MANAGEMENT - 4 (HDM-4) ALONG JCT. POTIA - MT. PROVINCE BDRY ROAD, - K0434+395 - K0438+444, K0439+800 - K0447+1

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Bangar Flood Control, Bangar, Alfonso Lista, Ifugao
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVIII-17-0025641

₱1,925,000.00 · FY2017

Released to Regional Office VI (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

23 projects · ₱290.6M total · 0 flags

Other projects by this contractor

No sat.

ASSET PRESERVATION OF NATIONAL ROADS - REHABILITATION/RECONSTRUCTION OF NATIONAL ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY - CONSTRUCTION OF ROAD SLOPE PROTECTION STRUCTURE - BANAUE - HUNGDUAN - BENGUET BDRY ROAD, K0347+750 -K0347+783, K0

Cordillera Administrative Region, Cordillera Administrative Region

2017₱60.5M
Reported complete (DPWH)
No sat.

OFF-CARRIAGEWAY IMPROVEMENT INCLUDING DRAINAGE ALONG NUEVA VIZCAYA-IFUGAO-MT. PROVINCE BOUNDARY ROAD

Ifugao 1st DEO, Cordillera Administrative Region

2017₱39.8M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE ALONG KIANGAN-TINOC-BUGUIAS ROAD, KIANGAN, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2017₱35.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROAD LEADING TO DECLARED TOURISM DESTINATION OF CUDOG-MUNGAYANG-KIANGAN ROAD LEADING TO AMBUAYA LAKE, YAMASHITA SHRINE AND KIYANGAN SETTLEMENT, KIANGAN AND LAGAWE, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2017₱32.4M
Reported complete (DPWH)
No sat.

ROAD UPGRADING (UNPAVED TO PAVED) ALONG BANAUE-HUNGDUAN-BENGUET BOUNDARY ROAD, K0365+288-K0365+365, K0366+427-K0366+680, K0375+824-K0376+116, K0384+(-508)-K0365+(-458), CHAINAGE 8385-CHAINAGE 8477, HUNGDUAN AND TINOC, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2017₱24.1M
Reported complete (DPWH)
No sat.

REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED NATIONAL ROAD INCLUDING DRAINAGE ALONG NUEVA NIZCAYA-IFUGAO-MT. PROVINCE BOUNDARY ROAD, K0314+000-K0314+870, K0324+025-K0324+738, KIANGAN AND HINGYON, IFUGAO

Ifugao 1st DEO, Cordillera Administrative Region

2017₱20.1M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱24,894,310.62

Progress

Reported complete (DPWH)

Start Date

March 29, 2017

Target End

July 11, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)City of DavaoMabuhay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.