Roads20AH0005

ASSET PRESERVATION-PREVENTIVE MAINTENANCE ALONG PANG-LA UNION INTER PROVL RD, K0386+000-K0386+461,

ASSET PRESERVATION-PREVENTIVE MAINTENANCE ALONG PANG-LA UNION INTER PROVL RD, K0386+000-K0386+461, is a DPWH-tracked public work in Pangasinan 2nd DEO, Region I. Reported contract value: ₱6,233,956.40. Status: Reported complete (DPWH). Contractor on record: PHILIPPINE CHEMSTEEL INDUSTRIES INC. Figures trace to dpwh.

Pangasinan 2nd DEO, Region I
Region: Region I

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱25,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROXI-20-0011777 · ₱124,000 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20AH0005 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-03-03 → 2019-03-03

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (preventive maintenance / overlay)

₱13,522,682 per km= 0.9x the Region I median (n=184)

Contract cost ₱6,233,956 ÷ 0.461 km read from the DPWH title (“K0386+000-K0386+461”; K-post / station range length). National percentile: 20. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ASSET PRESERVATION-PREVENTIVE MAINTENANCE ALONG PANG-LA UNION INTER PROVL RD, K0386+000-K0386+461,

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱25,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Agno River Basin Flood Control Project - Construction of River Bank Protection along Panacol, Aguilar, Pangasinan
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-20-0011777

₱124,000.00 · FY2020

Released to Panabo National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

368 projects · ₱14.1B total · 0 flags

Other projects by this contractor

No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG AGOO-BAGUIO CITY ROAD K0237+700 - K0237+800, K0247+500 - K0247+600, K0251+050 - K0251+150, K0251+300 - K0251+400, K0252+350 - K0252+600, K02

Region I, Region I

2023₱241.2M
Reported complete (DPWH)
No sat.

ACTIVE TRANSPORT BIKE SHARE SYSTEM AND SAFE PATHWAYS PROGRAM IN METROPOLITAN AREAS - EXPANSION OF ACTIVE TRANSPORT INFRASTRUCTURE

National Capital Region, National Capital Region

2022₱195.6M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG PANGASINAN-NUEVA VIZCAYA ROAD, PACKAGE 1, PANGASINAN

Region I, Region I

2024₱193.0M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A) URDANETA JCT-DAGUPAN RD- K0201+000-K0201+370, K0201+370-K0201+870, K0201+870-K0202+000, K0202+000-K0203+021, K0203+021-K0203+947, K0203+9

Region I, Region I

2023₱193.0M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND- MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A) JUDGE JOSE DE VENECIA SR. AVE - K0207+(-711) - K0207+(-611), K0207+(-611) - K0207+000, K0207+000 - K0207+073, K0207+183 - K0207+374, K020

Region I, Region I

2023₱193.0M
Reported complete (DPWH)
No sat.

SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A) SN CARLOS-CALASIAO RD- K0211 + 000 - K0212 + 000, K0212 + 000 - K0212 + 471, K0212 + 560 - K0212 + 696, K0212 + 696 - K0212 + 775, K021

Region I, Region I

2023₱192.9M
Reported complete (DPWH)
View all 368 projects →

4. Implementation

Contract Amount

₱6,233,956.40

Progress

Reported complete (DPWH)

Start Date

October 14, 2020

Target End

November 12, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region I (Ilocos Region)PangasinanMangaldanPoblacion
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.