Water Provision and Storage23BD0148

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF AMULUNG, CAGAYAN PROVINCE

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF AMULUNG, CAGAYAN PROVINCE is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱9,348,319.53. Status: Reported complete (DPWH). Contractor on record: AGCAOILI'S CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2023 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-23-0024446 · ₱679,288 · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱9,348,320 · AGCAOILI'S CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-03-22 → 2025-09-23

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP) - CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS WATER SUPPLY SYSTEM - CONSTRUCTION OF SOLAR WATER SYSTEM, MUNICIPALITY OF AMULUNG, CAGAYAN PROVINCE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Pinacanauan River Flood Management Projects, Camasi-Centro-Dodan, Pe±ablanca, Cagayan Phase II
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-23-0024446

₱679,288.00 · FY2023

Released to 0000000 Philippine Statistical - Research and Training Institute (formerly Statistical Research and Training Center) (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Convergence and Special Support Program (CSSP) – C

₱9,348,319.53 · AGCAOILI'S CONSTRUCTION

Award / contract ref: 23BD0148

Contractor

F

22 projects · ₱281.0M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - IMPROVEMENT OF ROAD, BRGY. CULONG - BRGY. BUGNAY, TUAO, CAGAYAN

Cagayan 3rd DEO, Region II

2023₱29.6M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) -ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES- CONSTRUCTION OF ROAD, BRGY. IRAGA, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2024₱29.3M
Past target date (DPWH On-Going)
No sat.

OO 1: - REHAB./ RECONST. / UPGRADING OF DAMAGED PAVED NATIONAL ROADS - TERTIARY ROADS - PEÑABLANCA-CALLAO CAVE RD - K0480+500 - K0481+076, K0481+180 - K0481+360, K0481+423 - K0481+765, K0481+887 - K0482+292, K0482+342 - K0482+558

Cagayan 3rd DEO, Region II

2024₱24.9M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONCRETING OF BRGY. LIWAN NORTE - SAN ANTONIO, ENRILE - UBONG, SOLANA, CAGAYAN

Cagayan 3rd DEO, Region II

2024₱19.5M
Past target date (DPWH On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES STRUCTURAL AND RESILIENCE PROGRAM - CONSTRUCTION OF MULTI- PURPOSE BUILDING AT CAGAYAN STATE UNIVERSITY (CSU) ANDREWS CAMPUS - PHASE 2, TUGUEGARAO CITY, CAGAYAN

Cagayan 3rd DEO, Region II

2024₱14.8M
Past target date (DPWH On-Going)
No sat.

CONCRETING OF BRGY. UBONG, SOLANA TO BRGY. SAN ANTONIO, ENRILE FMR, BRGY. UBONG, SOLANA AND BRGY. SAN ANTONIO ENRILE CAGAYAN

Cagayan 3rd DEO, Region II

2024₱14.8M
Reported complete (100% progress, DPWH status On-Going)
View all 22 projects →

4. Implementation

Contract Amount

₱9,348,319.53

Progress

Reported complete (DPWH)

Start Date

September 28, 2023

Target End

March 25, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanAmulungNangalasauan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.