Roads24DD0219

CONCRETING OF BRGY. QUILO-QUILO NORTH FMR, BRGY. QUILO-QUILO NORTH, PADRE GARCIA, BATANGAS

CONCRETING OF BRGY. QUILO-QUILO NORTH FMR, BRGY. QUILO-QUILO NORTH, PADRE GARCIA, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱14,477,250.00. Status: Reported complete (DPWH). Contractor on record: W RIVERA CONST AND EQUIPT RENTALS INC FORMERLY: W RIVERA CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROII-24-0019178 · · release to the district office, not itemized per project

    Possible match · score 0.60

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24DD0219 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-03-28 → 2020-03-28

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF BRGY. QUILO-QUILO NORTH FMR, BRGY. QUILO-QUILO NORTH, PADRE GARCIA, BATANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Manggas - Tamak River, Padre Garcia, Batangas
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROII-24-0019178

₱0.00 · FY2024

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

102 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES, CONSTRUCTION (COMPLETION) OF MULTI-PURPOSE FACILITY (COLISEUM) AT PANSOL, POBLACION 4, BAUAN, BATANGAS

Batangas 2nd DEO, Region IV-A

2023₱108.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING AT SAN ISIDRO EVACUATION COMPLEX, BATANGAS CITY, BATANGAS

Batangas 2nd DEO, Region IV-A

2023₱49.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, BASIC INFRASTRUCTURE PROGRAM (BIP), EVACUATION CENTERS/QUARANTINE FACILITIES/PUBLIC HEALTH FACILITIES, CONSTRUCTION OF MULTI-PURPOSE BUILDING (COMMUNITY CENTER), SAN ISIDRO EVACUATION COMPLEX, BATANGAS CITY, BATANG

Batangas 2nd DEO, Region IV-A

2023₱49.5M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM - CONSTRUCTION OF MULTI-PURPOSE BUILDING, POBLACION 4, BAUAN, BATANGAS

Batangas 2nd DEO, Region IV-A

2021₱39.6M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS, FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS, CONSTRUCTION OF FLOOD CONTROL STRUCTURE AT

Batangas 2nd DEO, Region IV-A

2020₱39.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF EVACUATION CENTER AT BRGY. LAUREL, SAN PASCUAL, BATANGAS PROVINCE

Region IV-A, Region IV-A

2018₱34.0M
Reported complete (DPWH)
View all 102 projects →

4. Implementation

Contract Amount

₱14,477,250.00

Progress

Reported complete (DPWH)

Start Date

July 30, 2024

Target End

October 13, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)BatangasPadre GarciaQuilo-quilo North
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.