Bridges15LE0127

CONSTRUCTION OF KATINGAN BRIDGE AND APPROACHES ALONG DAVAO-SARANGANI COASTAL ROAD MALALAG-MALITA-JAS-GLAN-JOSE ABAD SANTOS, DAVAO OCCIDENTAL-KM. 1762+800-KM. 1763+100

CONSTRUCTION OF KATINGAN BRIDGE AND APPROACHES ALONG DAVAO-SARANGANI COASTAL ROAD MALALAG-MALITA-JAS-GLAN-JOSE ABAD SANTOS, DAVAO OCCIDENTAL-KM. 1762+800-KM. 1763+100 is a DPWH-tracked public work in Davao Occidental DEO, Region XI. Reported contract value: ₱27,940,858.22. Status: Reported complete (DPWH). Contractor on record: MM MASULOT CONST CORP. Figures trace to dpwh.

Davao Occidental DEO, Region XI
Region: Region XI

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-16-0038857 · · release to the district office, not itemized per project

    Possible match · score 0.61

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱27,940,858 · MASULOT CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2010-06-23 → 2025-02-19

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF KATINGAN BRIDGE AND APPROACHES ALONG DAVAO-SARANGANI COASTAL ROAD MALALAG-MALITA-JAS-GLAN-JOSE ABAD SANTOS, DAVAO OCCIDENTAL-KM. 1762+800-KM. 1763+100

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Davao River Flood Control (F. Torres Bridge Section) (Upstream), Davao City
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-16-0038857

₱-13,759,448.00 · FY2016

Released to Bukidnon 2n (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

15LE0127,noa,reso,ntp,contract

₱27,940,858.22 · MASULOT CONSTRUCTION

Award / contract ref: 15LE0127

Contractor

A

59 projects · ₱1.8B total · 0 flags

4. Implementation

Contract Amount

₱27,940,858.22

Progress

Reported complete (DPWH)

Start Date

February 24, 2016

Target End

September 8, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XI (Davao Region)Davao OccidentalJose Abad SantosCaburan Big
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.