Buildings and Facilities19PE0041

CONSTRUCTION OF ADAOAY BARANGAY HALL/RHU, ADAOAY, KABAYAN, BENGUET

CONSTRUCTION OF ADAOAY BARANGAY HALL/RHU, ADAOAY, KABAYAN, BENGUET is a DPWH-tracked public work in Benguet 1st DEO, Cordillera Administrative Region. Reported contract value: ₱494,791.25. Status: Reported complete (DPWH). Contractor on record: F B BANTALES ENGINEERING CONST. Figures trace to dpwh.

Benguet 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROVI-19-0023090 · ₱187,580 · release to the district office, not itemized per project

    Possible match · score 0.75

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19PE0041 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-19 → 2023-02-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF ADAOAY BARANGAY HALL/RHU, ADAOAY, KABAYAN, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROVI-19-0023090

₱187,580.00 · FY2019

Released to Bago National High School (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

82 projects · ₱3.5B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF PUERTO PRINCESA WEST COASTAL BYPASS ROAD, BRGY. BACUNGAN-SIMPOCAN, PTO. PRINCESA CITY, PALAWAN

Region IV-B, Region IV-B

2023₱187.8M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL JCT. (SECTION 2 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) INCL. ROW

Cordillera Administrative Region, Cordillera Administrative Region

2018₱137.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS BALLAY-TABIO-TONOMAN-BULALACAO-TAWANGAN-LUSOD ROAD LEADING TO BULALACAO LAKES AND MT. TABEO, KABAYAN, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2017₱96.5M
Reported complete (DPWH)
No sat.

REHABILITATION/IMPROVEMENT OF MADEGNAK-AGSIMAO ROAD, TINEG, ABRA

Abra DEO, Cordillera Administrative Region

2018₱96.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE -BENGUET-NUEVA VIZCAYA ROAD, K0271+780 - 0271+824, ITOGON, BENGUET, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2018₱96.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS / NEW ROADS (ROAD OPENING), BESAO - TUBO (VIA TAMBOAN), ABRA

Abra DEO, Cordillera Administrative Region

2018₱96.2M
Reported complete (DPWH)
View all 82 projects →

4. Implementation

Contract Amount

₱494,791.25

Progress

Reported complete (DPWH)

Start Date

August 27, 2019

Target End

October 25, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetKabayanAdaoay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Active faultFlood (100-yr rain)LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.