Buildings and Facilities22BC0166

CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CADONGDONGAN ELEMENTARY SCHOOL, STA. PRAXEDES, CAGAYAN

CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CADONGDONGAN ELEMENTARY SCHOOL, STA. PRAXEDES, CAGAYAN is a DPWH-tracked public work in Cagayan 2nd DEO, Region II. Reported contract value: ₱4,906,706.34. Status: Reported complete (DPWH). Contractor on record: 5RD KECK CONST. Figures trace to dpwh.

Cagayan 2nd DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22BC0166 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-09-30 → 2025-05-14

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱2,453,353 per classroom= 1.9x the Region II median (n=370)

Contract cost ₱4,906,706 ÷ 2 classroom read from the DPWH title (“2 CLASSROOM”; classroom count in title). National percentile: 79. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 1 STOREY 2 CLASSROOM WITH CR AT CADONGDONGAN ELEMENTARY SCHOOL, STA. PRAXEDES, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 85%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Langgangan River, Sanjera San Pablo of Brgy. Capacuan, Sta. Praxedes, Cagayan
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Cagayan 2nd DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

7 projects · ₱51.7M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM - ROLL-IT) - ACCESS ROAD LEADING TO PALUSAO-NIUG

Cagayan 2nd DEO, Region II

2025₱11.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- BASIC INFRASTRUCTURE PROGRAM (BIP)- MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES- REHABILITATION OF STO. NIÑO MULTI-PURPOSE BUILDING (MUNICIPAL HALL), STO. NIÑO, CAGAYAN

Cagayan 2nd DEO, Region II

2024₱9.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: BASIC INFRASTRUCTURE PROGRAM (BIP) - MULTI-PURPOSE BUILDINGS/FACILITIES TO SUPPORT SOCIAL SERVICES - CONSTRUCTION OF MULTI-PURPOSE BUILDING AT BRGY. CENTRO, SANTA PRAXEDES, CAGAYAN

Cagayan 2nd DEO, Region II

2025₱8.8M
Past target date (DPWH On-Going)
No sat.

CSSP-BIP-ACCESS ROADS AND/ OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF MATALAO-SITIO NITO ROAD, STO. NIÑO, CAGAYAN

Cagayan 2nd DEO, Region II

2023₱6.8M
Reported complete (DPWH)
No sat.

CSSP-CONS./IMPROVEMENT OF ACCESS RDS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES (ROLL-IT) - ACCESS ROAD LEADING TO PALUSAO-NIUG IN SUPPORT OF VEGETABLES AND CROPS INDUSTRY, STO. NIÑO, CAGAYAN

Cagayan 2nd DEO, Region II

2024₱6.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-ACCESS ROAD LEADING TO NAMILAGAN CAVE, NAMUAC, SANCHEZ MIRA, CAGAYAN

Cagayan 2nd DEO, Region II

2023₱3.7M
Reported complete (DPWH)
View all 7 projects →

4. Implementation

Contract Amount

₱4,906,706.34

Progress

Reported complete (DPWH)

Start Date

November 22, 2022

Target End

July 15, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanSanta PraxedesCadongdongan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.