Bridges20NG0021

BRIDGE PROGRAM REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES TAGANITO BR.1 (B00992MN), ALONG SURIGAO-DAVAO COASTAL ROAD/BRGY. TAGANITO, CLAVER, SURIGAO DEL NORTE K1192+375 - K1192+592

BRIDGE PROGRAM REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES TAGANITO BR.1 (B00992MN), ALONG SURIGAO-DAVAO COASTAL ROAD/BRGY. TAGANITO, CLAVER, SURIGAO DEL NORTE K1192+375 - K1192+592 is a DPWH-tracked public work in Surigao del Norte 2nd DEO, Region XIII. Reported contract value: ₱29,397,095.59. Status: Reported complete (DPWH). Contractor on record: A T DUMLAO CONST INC FORMERLYANDONI T D. Figures trace to dpwh.

Surigao del Norte 2nd DEO, Region XIII
Region: Region XIII

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2020 · ₱40,000

    Probable match · score 0.86

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20NG0021 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-05-06 → 2025-07-25

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BRIDGE PROGRAM REHABILITATION/MAJOR REPAIR OF PERMANENT BRIDGES TAGANITO BR.1 (B00992MN), ALONG SURIGAO-DAVAO COASTAL ROAD/BRGY. TAGANITO, CLAVER, SURIGAO DEL NORTE K1192+375 - K1192+592

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 86%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures along Magallanes River, Magallanes, Claver, Surigao del Norte
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Surigao del Norte 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

4. Implementation

Contract Amount

₱29,397,095.59

Progress

Reported complete (DPWH)

Start Date

March 23, 2020

Target End

June 22, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XIII (Caraga)Surigao del NorteClaverTaganito
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.