Bridges, Roads20DC0073

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TAAL LAKE CIRCUMFERENTIAL ROAD (AGONCILLO SECTION), AGONCILLO, BATANTANGAS

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TAAL LAKE CIRCUMFERENTIAL ROAD (AGONCILLO SECTION), AGONCILLO, BATANTANGAS is a DPWH-tracked public work in Batangas 3rd DEO, Region IV-A. Reported contract value: ₱48,996,392.91. Status: Reported complete (DPWH). Contractor on record: OIC CONZTRUCT AND SUPPLY CORP FORMERLY:OIC CONST. Figures trace to dpwh.

Batangas 3rd DEO, Region IV-A
Region: Region IV-A

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱2,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱46,919,558 · OIC CONZTRUCT AND SUPPLY

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-04-16 → 2025-04-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TAAL LAKE CIRCUMFERENTIAL ROAD (AGONCILLO SECTION), AGONCILLO, BATANTANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱2,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Systems, Alitagtag, Batangas
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Batangas 3rd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

20DC0073 - CONVERGENCE AND SPECIAL SUPPORT PROGRAM

₱46,919,558.00 · OIC CONZTRUCT AND SUPPLY

Award / contract ref: 20DC0073

Contractor

A

265 projects · ₱2.3B total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, TAAL LAKE CIRCUMFERENTIAL ROAD (BALETE-MATAAS NA KAHOY SECTION), BALETE AND MATAAS NA KAHOY, BATANGAS

Batangas 3rd DEO, Region IV-A

2020₱96.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF MALVAR-BALETE DIVERSION RO

Batangas 3rd DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, TINGLOY CIRCUMFERENTIAL ROAD, BATANGAS PACK

Batangas 2nd DEO, Region IV-A

2024₱94.1M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES, CONSTRUCTION OF TINGLOY CIRCUMFERENTIAL ROA

Batangas 2nd DEO, Region IV-A

2025₱93.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION, REHABIL

Batangas 3rd DEO, Region IV-A

2018₱77.2M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, ASSET PRESERVATION PROGRAM, REHABILITATION/ RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, BAUAN-MABINI RD -K0174+000 - K0174+945, K0175+100 - K0175+300, K0175+7

Batangas 2nd DEO, Region IV-A

2022₱67.5M
Reported complete (DPWH)
View all 265 projects →

4. Implementation

Contract Amount

₱48,996,392.91

Progress

Reported complete (DPWH)

Start Date

November 25, 2020

Target End

September 20, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)BatangasAgoncilloSan Teodoro
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.