Roads22FK0058

CLUSTER XXV-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES 1.) IMPROVEMENT OF ROAD AT BRGY. MALAPOC, DONSOL, S

CLUSTER XXV-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES 1.) IMPROVEMENT OF ROAD AT BRGY. MALAPOC, DONSOL, S is a DPWH-tracked public work in Sorsogon DEO, Region V. Reported contract value: ₱49,460,138.97. Status: Reported complete (DPWH). Contractor on record: KM88 CONST INC FORMERLY: KM14 CONST INC. Figures trace to dpwh.

Sorsogon DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2022 · ₱10,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FK0058 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-08-07 → 2025-06-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUSTER XXV-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES   1.) IMPROVEMENT OF ROAD AT BRGY. MALAPOC, DONSOL, S

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱10,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Project Cumadcad River at Sogoy Boundary, Brgy. Cumadcad, Castilla, Sorsogon
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Sorsogon DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

27 projects · ₱1.0B total · 0 flags

Other projects by this contractor

No sat.

CLUSTER X-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) CONST. OF SAN RAMON CIRCUMFERENTIAL ROAD, DONSOL, 2

Sorsogon DEO, Region V

2024₱86.4M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE & RELIABLE NAT'L. ROAD SYSTEM - NETWORK DEV'T. PROG. RD. WIDEN

Sorsogon 2nd DEO, Region V

2025₱83.4M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -REHABILITATION OF ROAD (GATE 1, 2, 3 AND OT

Sorsogon DEO, Region V

2025₱76.0M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CCSP)-BASIC INFRASTRUCTURE PROJECT (BIP)-ACCESS ROADS AND_OR BRIDGES FROM THE NATIONAL ROAD_S LEADING TO MAJOR_STRATEGIC PUBLIC BUILDINGS_FACILITIES-CONSTRUCTION OF RIZAL-TIRIS-GOGON-ESCUALA ROAD, CASIGURAN

Sorsogon DEO, Region V

2022₱74.2M
Reported complete (DPWH)
No sat.

CLUSTER XIV-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) CONST. OF ROAD BRGY. ABAS TO SITIO CASTILLA, BRGY

Sorsogon DEO, Region V

2024₱61.4M
Reported complete (DPWH)
No sat.

CLUSTER XIV-CONVERGENCE AND SPECIAL SUPPORT PROGRAM (CSSP)-BASIC INFRASTRUCTURE PROGRAM (BIP)-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROADS LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-1.) ROAD IMPROVEMENT OF BARANGAYS FROM BANUANG GURANG-

Sorsogon DEO, Region V

2025₱58.1M
Past target date (DPWH On-Going)
View all 27 projects →

4. Implementation

Contract Amount

₱49,460,138.97

Progress

Reported complete (DPWH)

Start Date

April 4, 2022

Target End

October 21, 2022

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonDonsolGura
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.