Buildings and Facilities19DG0041

CONST OF MPB (BARANGAY HALL), BRGY. BUCAL 3A, MARAGONDON, CAVITE

CONST OF MPB (BARANGAY HALL), BRGY. BUCAL 3A, MARAGONDON, CAVITE is a DPWH-tracked public work in Cavite 2nd DEO, Region IV-A. Reported contract value: ₱3,282,345.48. Status: Reported complete (DPWH). Contractor on record: N B AVILA CONST. Figures trace to dpwh.

Cavite 2nd DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-BMB-B-19-0012958 · ₱46,889,208 · release to the district office, not itemized per project

    Possible match · score 0.80

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19DG0041 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2010-01-30 → 2025-08-18

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST OF MPB (BARANGAY HALL), BRGY. BUCAL 3A, MARAGONDON, CAVITE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-BMB-B-19-0012958

₱46,889,208.00 · FY2019

Released to East Avenue Medical Center (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

266 projects · ₱6.8B total · 1 flags

Other projects by this contractor

No sat.

LOCAL PROGRAM - LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS- CONSTRUCTION/REPAIR/ REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, WIDENING OF MALAGASANG-BUCANDALA-ALAPAN RD., IMUS, CAVITE

Cavite 1st DEO, Region IV-A

2020₱96.5M
Reported complete (DPWH)
No sat.

PREVENTIVE MAINTENANCE OF ROAD: ASPHALT OVERLAY ALONG MAR-MAG-AMUYONG RD K0054+(-536)-K0055+730,K005

Cavite 2nd DEO, Region IV-A

2024₱96.5M
Reported complete (DPWH)
No sat.

REHABILITATION/ RECONSTRUCTION/ UPGRADING OF DAMAGED PAVED ROADS - SECONDARY ROADS - CAVITE-BATANGAS ROAD (S01988LZ)

Cavite 3rd DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)

ORGANIZATIONAL OUTCOME 2 - PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM, CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION ALONG BALUCTOT RIVER, PHASE II, BRGY.

Cavite 3rd DEO, Region IV-A

2020₱96.5M
Reported complete (DPWH)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF ROAD FROM BRGY. SABANG TO BRGY. SAN JOSE, DASMARIÑAS CITY, CAVIT

Cavite 3rd DEO, Region IV-A

2022₱96.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODSFLOOD MANAGEMENT PROGRAMCONST/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEMSCONST OF REVETMENT ALONG MALIMANGO RIVER, BRGY BAGBAG 1, PHASE1, ROSARIO, CAVITE

Cavite 1st DEO, Region IV-A

2024₱95.6M
Past target date (DPWH On-Going)
View all 266 projects →

4. Implementation

Contract Amount

₱3,282,345.48

Progress

Reported complete (DPWH)

Start Date

August 5, 2019

Target End

December 2, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)CaviteMaragondonBucal III A
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.