Roads21PE0005

RECONSTRUCTION TO CONCRETE PAVEMENT - MARCOS HI-WAY, K0272+654 - K0273+000, TUBA, BENGUET

RECONSTRUCTION TO CONCRETE PAVEMENT - MARCOS HI-WAY, K0272+654 - K0273+000, TUBA, BENGUET is a DPWH-tracked public work in Benguet 1st DEO, Cordillera Administrative Region. Reported contract value: ₱12,969,688.06. Status: Reported complete (DPWH). Contractor on record: BALANGCOD CONST. Figures trace to dpwh.

Benguet 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱1,500 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱12,969,779 · BALANGCOD CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-01-04 → 2025-08-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (rehabilitation / reconstruction)

₱37,484,648 per km= 1.1x the Cordillera Administrative Region median (n=58)

Contract cost ₱12,969,688 ÷ 0.346 km read from the DPWH title (“K0272+654 - K0273+000”; K-post / station range length). National percentile: 74. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: RECONSTRUCTION TO CONCRETE PAVEMENT - MARCOS HI-WAY, K0272+654 - K0273+000, TUBA, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱1,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Aringay River Basin, Lasilas-Nangalisan Section, Tuba, Benguet
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Benguet 1st DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Concreting at Tuba, Benguet

₱12,969,779.30 · BALANGCOD CONSTRUCTION

Award / contract ref: 21PE0005

Contractor

B

9 projects · ₱55.1M total · 0 flags

4. Implementation

Contract Amount

₱12,969,688.06

Progress

Reported complete (DPWH)

Start Date

March 1, 2021

Target End

June 27, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetTubaTaloy Norte
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.