Buildings and Facilities18PE0088

CONSTRUCTION OF 4 STOREY 16 CLASSROOM SCHOOL BUILDING AT PUGUIS ELEMENTARY SCHOOL, LA TRINIDAD, BENGUET

CONSTRUCTION OF 4 STOREY 16 CLASSROOM SCHOOL BUILDING AT PUGUIS ELEMENTARY SCHOOL, LA TRINIDAD, BENGUET is a DPWH-tracked public work in Benguet 1st DEO, Cordillera Administrative Region. Reported contract value: ₱37,656,211.98. Status: Reported complete (DPWH). Contractor on record: F B BANTALES ENGINEERING CONST. Figures trace to dpwh.

Benguet 1st DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱47,500 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROX-18-0002448 · ₱14,611 · release to the district office, not itemized per project

    Possible match · score 0.73

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 18PE0088 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2018-02-25 → 2025-08-04

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 4 STOREY 16 CLASSROOM SCHOOL BUILDING AT PUGUIS ELEMENTARY SCHOOL, LA TRINIDAD, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱47,500,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure along Naguillian River Basin Balili River Section, La Trinidad, Benguet
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROX-18-0002448

₱14,611.00 · FY2018

Released to Division of Misamis Oriental (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

82 projects · ₱3.5B total · 0 flags

Other projects by this contractor

No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG)- COASTAL ROADS/CAUSEWAY FOR ENVIRONMENTAL PROTECTION/CONSERVATION- CONST. OF PUERTO PRINCESA WEST COASTAL BYPASS ROAD, BRGY. BACUNGAN-SIMPOCAN, PTO. PRINCESA CITY, PALAWAN

Region IV-B, Region IV-B

2023₱187.8M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM NETWORK DEVELOPMENT - CONSTRUCTION OF MISSING LINKS/NEW ROADS KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL JCT. (SECTION 2 OF BLISTT OUTER RING CIRCUMFERENTIAL ROAD) INCL. ROW

Cordillera Administrative Region, Cordillera Administrative Region

2018₱137.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS, AND DECLARED TOURISM DESTINATIONS BALLAY-TABIO-TONOMAN-BULALACAO-TAWANGAN-LUSOD ROAD LEADING TO BULALACAO LAKES AND MT. TABEO, KABAYAN, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2017₱96.5M
Reported complete (DPWH)
No sat.

REHABILITATION/IMPROVEMENT OF MADEGNAK-AGSIMAO ROAD, TINEG, ABRA

Abra DEO, Cordillera Administrative Region

2018₱96.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF SLOPE PROTECTION STRUCTURE -BENGUET-NUEVA VIZCAYA ROAD, K0271+780 - 0271+824, ITOGON, BENGUET, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2018₱96.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINKS / NEW ROADS (ROAD OPENING), BESAO - TUBO (VIA TAMBOAN), ABRA

Abra DEO, Cordillera Administrative Region

2018₱96.2M
Reported complete (DPWH)
View all 82 projects →

4. Implementation

Contract Amount

₱37,656,211.98

Progress

Reported complete (DPWH)

Start Date

June 22, 2018

Target End

April 17, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetLa TrinidadPuguis
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.