Roads19FE0057

ROAD CONCRETING BRGY. PINIT, OCAMPO, CAMARINES SUR

ROAD CONCRETING BRGY. PINIT, OCAMPO, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 3rd DEO, Region V. Reported contract value: ₱1,737,089.78. Status: Reported complete (DPWH). Contractor on record: STA CRUZ CONST. Figures trace to dpwh.

Camarines Sur 3rd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    SARO SARO-ROV-19-0018815 · · release to the district office, not itemized per project

    Possible match · score 0.78

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 19FE0057 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-05-15 → 2025-09-12

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD CONCRETING BRGY. PINIT, OCAMPO, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-19-0018815

₱0.00 · FY2019

Released to Division of Camarines Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

23 projects · ₱168.6M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOOD-FLOOD MGT. PROG.CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASIN REHAB./UPGRADING OF BICOL RIVER FLOOD CONTROL SYSTEM,BRGY. TAROSANAN CAMALIGAN CAM. SUR

Camarines Sur 3rd DEO, Region V

2020₱24.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJOR FLOOD FLOOD MGT. PROGRAM-CONST./REHAB. OF FLOOD MITIGATION FACILITIES W/IN MAJOR RIVER BASIN CONST. OF BICOL RIVER FLOOD CONTROL BRGY. MANGAYAWAN CANAMAN CAM. SUR

Camarines Sur 3rd DEO, Region V

2020₱23.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF VARIOUS INFRASTRUCTURE IN SUPPORT OF NATIONAL SECURITY-CONST. OF PERIMETER FENCE,PHASE 2 H91D,CAMP ELIAS ANGELES, SAN JOSE PILI CAM SUR

Camarines Sur 3rd DEO, Region V

2020₱18.0M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM BRIDGE PROGRAM-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-HINAGYANAN BR. (B04199LZ) ALONG MANGUIRING-CAGSAO-CABANBANAN ROAD

Camarines Sur 3rd DEO, Region V

2019₱14.9M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 2: PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOOD-FLOOD MANAGEMENT PROGRAM-CONSTRUCTION/REHABILITATION/IMPROVEMENT OF BRGY. MANGAYAWAN FLOOD CONTOL, CANAMAN, CAMARINES SUR

Camarines Sur 3rd DEO, Region V

2018₱13.9M
Reported complete (DPWH)
No sat.

CONCRETING OF BRGY. FABRICA FMR, BRGY. FABRICA, CALABANGA CAMARINES SUR

Camarines Sur 3rd DEO, Region V

2021₱9.9M
Reported complete (DPWH)
View all 23 projects →

4. Implementation

Contract Amount

₱1,737,089.78

Progress

Reported complete (DPWH)

Start Date

July 12, 2019

Target End

September 9, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurOcampoPinit
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.