Buildings and Facilities20CH0032

CONSTRUCTION OF 4 STOREY 12 CLASSROOM SAN JOSE HIGHSCHOOL, FLORIDABLANCA, PAMPANGA

CONSTRUCTION OF 4 STOREY 12 CLASSROOM SAN JOSE HIGHSCHOOL, FLORIDABLANCA, PAMPANGA is a DPWH-tracked public work in Pampanga 2nd DEO, Region III. Reported contract value: ₱37,995,464.27. Status: Reported complete (DPWH). Contractor on record: PING-ANN'S CONST. Figures trace to dpwh.

Pampanga 2nd DEO, Region III
Region: Region III

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2020 · ₱40,768 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 20CH0032 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-02-23 → 2025-08-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · School building, cost per classroom (new school building)

₱3,166,289 per classroom= 1.6x the Region III median (n=829)

Contract cost ₱37,995,464 ÷ 12 classroom read from the DPWH title (“12 CLASSROOM”; classroom count in title). National percentile: 94. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF 4 STOREY 12 CLASSROOM SAN JOSE HIGHSCHOOL, FLORIDABLANCA, PAMPANGA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱40,768,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structures and Drainage System – Construction of Dike and Revetment along Caulaman River, Bodega, Floridablanca, Pampanga
GAA fiscal year
FY2020
DBM GAA source document

2. Allotment

Agency-level releases for FY2020, not tied to this contract

Pampanga 2nd DEO · SARO 1,970 (₱160,521,624,356.00) · NCA 998 (₱407,918,568,220.27)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

40 projects · ₱451.2M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL PROGRAM;CONST/IMPROVEMENT OF ACCESS ROAD LEADING TO TRADES INDUSTRIES AND ECONOMIC ZONES;CLARK NORTH ACCESS ROADS FROM MAC ARTHUR HIGHWAY TO P. BALAGTAS AVENUE,MABALACAT CITY,PAMPANGA

Pampanga 3rd DEO, Region III

2020₱24.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM; CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES,INDUSTRIES AND ECONOMIC ZONES ( ROADS LEVERGING LINKAGES FOR INDUSTRY AND TRADE INFRASTRUCTURE PROGRAM -ROLL-IT), STA INES-ATLU BOLA ROAD, MABALACAT, PAMPA

Pampanga 3rd DEO, Region III

2023₱24.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF THE DENR-ENVIRONMENTAL MANAGEMENT BUREAU-REGION 3 BUILDING (COMPLETION), DMGC, MAIMPIS, CITY OF SAN FERNANDO, PAMPANGA

Region III, Region III

2018₱20.6M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM,FLOOD CONTROL STRUCTURE/FACILITIES;CONST/REHAB OF DRAINAGE SYSTEM AT MABALACAT CITY PAMPANGA

Pampanga 3rd DEO, Region III

2019₱19.6M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS, SINDALAN, CITY OF SAN FERNANDO, PAMPANGA, LA TORRE, TALAVERA, NUEVA ECIJA, BALER, AURORA AND SAN FRANCISCO, CONCEPCION, TARLAC

Region III, Region III

2018₱19.3M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM-BUILDINGS AND OTHER STRUCTURES-MULTIPURPOSE/FACILITIES-NATIONAL BUILDING PROGRAM-REHABILITATION OF MULTI-PURPOSE BUILDING, DPWH-REGIONAL OFFICE NO. III, REGIONAL OFFICE COMPOUND, SINDALAN, CITY OF SAN FERNANDO, PAMPANGA

Region III, Region III

2021₱19.1M
Reported complete (DPWH)
View all 40 projects →

4. Implementation

Contract Amount

₱37,995,464.27

Progress

Reported complete (DPWH)

Start Date

October 13, 2020

Target End

August 23, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region III (Central Luzon)PampangaFloridablancaFortuna
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.