Buildings and Facilities16DD0226No coordinates published by DPWH

REHABILITATION/EXPANSION OF RHU, LIPA CHO (NORTH DISTRICT), LIPA CITY, BATANGAS

REHABILITATION/EXPANSION OF RHU, LIPA CHO (NORTH DISTRICT), LIPA CITY, BATANGAS is a DPWH-tracked public work in Batangas 4th DEO, Region IV-A. Reported contract value: ₱1,466,430.00. Status: Reported complete (DPWH). Contractor on record: MGDJ CONST. Figures trace to dpwh.

Batangas 4th DEO, Region IV-A

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-A

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.81

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-C-16-0019265 · ₱60,695,286 · release to the district office, not itemized per project

    Possible match · score 0.58

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱1,466,430 · MGDJ CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: REHABILITATION/EXPANSION OF RHU, LIPA CHO (NORTH DISTRICT), LIPA CITY, BATANGAS

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 81%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Repair/Maintenance of Flood Control Project along San Juan Laiya Road, Putingbuhangin, Nagsaulay Section, Batangas City
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-C-16-0019265

₱60,695,286.00 · FY2016

Released to Light Rail Transit Authority (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

16DD0226

₱1,466,430.00 · MGDJ CONSTRUCTION

Award / contract ref: 16DD0226

Contractor

A

44 projects · ₱269.5M total · 0 flags

Other projects by this contractor

No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, SAN PEDRO-STA. CRUZ ECOTOURISM ROAD LEADING TO NATIONAL SHRINE OF ST. PADRE PIO, STO. TOMAS, BATANGAS

Batangas 3rd DEO, Region IV-A

2019₱29.4M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, CONSTRUCTION/REPAIR/REHABILITATION/ IMPROVEMENT OF VARIOUS INFRASTRUCTURE INCLUDING LOCAL PROJECTS, LOCAL ROADS AND BRIDGES, LOCAL ROADS, REHABILITATION/IMPROVEMENT OF ROAD, A.) BARANGAY LATAG B.) BARANGAY MUNTING PULO C.) BARANGAY SAN ISID

Batangas 4th DEO, Region IV-A

2018₱19.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, TO MORE THAN 2 LANES, MAYAO BRIDGE (B02941LZ) ALONG MSR OLD ROUTE (LZ), LUCENA CITY QUEZON

Quezon 2nd DEO, Region IV-A

2016₱13.7M
Reported complete (DPWH)
No sat.

LOCAL PROGRAM, LOCAL INFRASTRUCTURE PROGRAM, LOCAL ROADS AND BRIDGES, LOCAL ROADS, A.) REHABILITATION/IMPROVEMENT OF ROAD AT BARANGAY LATAG B.) REHABILITATION/IMPROVEMENT OF ROAD AT BARANGAY TANGOB C.) REHABILITATION/IMPROVEMENT OF ROAD, BARANGAY 10, LIPA

Batangas 4th DEO, Region IV-A

2018₱11.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION AND MAINTENANCE OF BRIDGES ALONG NATIONAL ROADS, WIDENING OF PERMANENT BRIDGES, TO MORE THAN 2 LANES, SARIAYA BRIDGE (B03090LZ) ALONG DAANG MAHARLIKA (LZ), SARIAYA, QUEZON

Quezon 2nd DEO, Region IV-A

2017₱10.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF TWO (2) STOREY FOUR (4) CLASSROOM ACADEMIC SCHOOL BUILDING AT DOLORES CENTRAL SCHOOL, DOLORES, QUEZON

Quezon 2nd DEO, Region IV-A

2017₱10.7M
Reported complete (DPWH)
View all 44 projects →

4. Implementation

Contract Amount

₱1,466,430.00

Progress

Reported complete (DPWH)

Start Date

November 16, 2016

Target End

January 14, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)Batangas
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.