Construction of Revetment23KB0039

Construction of Revetment, Downstream and Upstream of Steel Bridge along Pulangi River, Barangay Natulongan, Kibawe, Bukidnon, Package 2

Construction of Revetment, Downstream and Upstream of Steel Bridge along Pulangi River, Barangay Natulongan, Kibawe, Bukidnon, Package 2 is a DPWH-tracked public work in KIBAWE (BUKIDNON), BUKIDNON, Region X. Reported contract value: ₱53,075,000.00. Status: Reported complete (DPWH). Contractor on record: PYRAMID CONSOLIDATED BUILDERS & GEN MDSE. Figures trace to sumbong.

KIBAWE (BUKIDNON), BUKIDNON, Region X
Region: Region X

Follow the peso

3 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2023 · ₱29,510

    Probable match · score 0.87

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱52,100,721 · PYRAMID CONSOLIDATED BUILDERS & GENERAL MERCHANDISE

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2019-02-02 → 2025-01-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Site vs flood hazard · Project NOAH 100-year map

High flood hazard · Bukidnon

Based on the coordinates published with the DPWH record and NOAH file Bukidnon.zip. Pins are sometimes placed at the town center rather than the site. NOAH data (ODbL) · Need vs spending by province

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: Construction of Revetment, Downstream and Upstream of Steel Bridge along Pulangi River, Barangay Natulongan, Kibawe, Bukidnon, Package 2

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 87%

UACS
18001
Amount
₱29,510,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure along Sagayaran River (Upstream) of Nabaliwa Bridge with Slope Protection, Pangantucan, Package 1, Bukidnon
GAA fiscal year
FY2023
DBM GAA source document

2. Allotment

Agency-level releases for FY2023, not tied to this contract

Bukidnon 2nd District Engineering Office · SARO 16 (₱22,616,681,592.00) · NCA 0 (₱0.00)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

flood Control

₱52,100,720.87 · PYRAMID CONSOLIDATED BUILDERS & GENERAL MERCHANDISE

Award / contract ref: 23KB0039

4. Implementation

Contract Amount

₱53,075,000.00

Progress

Reported complete (DPWH)

Start Date

February 28, 2023

Target End

December 3, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)BukidnonKibaweMagsaysay
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.