Multi Purpose Buildings, School Buildings19FA0057

CLUDTER 32-CONSTRUCTION OF CLASSROOMS, MULTI-PURPOSE BUILDINGS AND DAY CARE CENTER IN THE FIRST DISTRICT OF ALBAY

CLUDTER 32-CONSTRUCTION OF CLASSROOMS, MULTI-PURPOSE BUILDINGS AND DAY CARE CENTER IN THE FIRST DISTRICT OF ALBAY is a DPWH-tracked public work in Albay 1st DEO, Region V. Reported contract value: ₱39,105,000.00. Status: Reported complete (DPWH). Contractor on record: DSB CONST. Figures trace to dpwh.

Albay 1st DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    NCA NCA-ROXI-19-0019722 · ₱241,576 · release to the district office, not itemized per project

    Possible match · score 0.70

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱37,903,946 · DSB CONSTRUCTION & SUPPLY, .

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2011-09-29 → 2025-10-05

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CLUDTER 32-CONSTRUCTION OF CLASSROOMS, MULTI-PURPOSE BUILDINGS AND DAY CARE CENTER IN THE FIRST DISTRICT OF ALBAY

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2019 GAA. DBM GAA FY2019

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROXI-19-0019722

₱241,576.00 · FY2019

Released to Division of Davao del Norte (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Contract ID No. 19FA0057

₱37,903,945.97 · DSB CONSTRUCTION & SUPPLY, .

Award / contract ref: 19FA0057

Contractor

B

117 projects · ₱5.4B total · 0 flags

Other projects by this contractor

No sat.

MFO3-MAINT. & CONST. SERVICES OF OTHER INFRASTRUCTURE: CONST./IMPV'T. OF ACCESS ROADS LEADING TO AIRPORTS, SEAPORTS AND DECLARED TOURISM DESTINATIONS, CAGRARAY CIRCUMFERENTIAL ROAD(MISIBIS-CAGBULACAO-CAGRARAY-PIGCOBOHAN-TAMBILAGAO SECTION)LEADING TO MISIB

Region V, Region V

2016₱193.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPV'T. OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION: CAGRARAY CIRCUMFERENTIAL ROAD, BACACAY, ALBAY

Albay 1st DEO, Region V

2020₱144.8M
Reported complete (DPWH)
No sat.

CONST./IMPRVT. OF ACCESS ROAD TO TOURIST DESTINATIONS, CONCRETING OF ACCESS ROAD FROM BRGY. POLANGI-BRGY. PANAYURAN-BRGY. LITERON, LEADING TO LULUGAYAN FALLS, CALBIGA RIVER AND LANGUN-GOBINGOB CAVES, CALBIGA, SAMAR

Region VIII, Region VIII

2016₱139.9M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP), CAGRARAY CIRCUMFERENTIAL ROAD, BACACAY, ALBAY, BACACAY, ALBAY (1ST LEGISLATIVE DISTRICT)

Region V, Region V

2021₱101.3M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM - BASIC INFRASTRUCTURE PROGRAM (BIP) - FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF TALISAY RIVER FLOOD MITIGATION STRUCTURE, BRGY SAN JUAN AND BRGY PISTOLA,

Albay 3rd DEO, Region V

2025₱96.6M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATION, CAGRARAY CIRCUMFERETIAL ROAD, BACACAY, ALBAY

Albay 1st DEO, Region V

2019₱96.5M
Reported complete (DPWH)
View all 117 projects →

4. Implementation

Contract Amount

₱39,105,000.00

Progress

Reported complete (DPWH)

Start Date

July 8, 2019

Target End

March 3, 2020

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)AlbayMalilipotSan Jose
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.