GAA 2022 OO-122FG0025

CONSTRUCTION OF MISSING LINKS / NEW ROAD, LALUD-GARCHITORENA ROAD STA. 11+000.00 - STA. 15+020.00, LAGONOY, CAMARINES SUR

CONSTRUCTION OF MISSING LINKS / NEW ROAD, LALUD-GARCHITORENA ROAD STA. 11+000.00 - STA. 15+020.00, LAGONOY, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 4th DEO, Region V. Reported contract value: ₱91,675,000.00. Status: Reported complete (DPWH). Contractor on record: PARTIDO CONST. Figures trace to dpwh.

Camarines Sur 4th DEO, Region V
Region: Region V

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2022 · ₱5,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22FG0025 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-09-02 → 2025-07-26

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱22,804,726 per km= 1.0x the Region V median (n=151)

Contract cost ₱91,675,000 ÷ 4.02 km read from the DPWH title (“STA. 11+000.00 - STA. 15+020.00”; K-post / station range length). National percentile: 41. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF MISSING LINKS / NEW ROAD, LALUD-GARCHITORENA ROAD STA. 11+000.00 - STA. 15+020.00, LAGONOY, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱5,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Mitigation Structure, Lagonoy, Camarines Sur
GAA fiscal year
FY2022
DBM GAA source document

2. Allotment

Agency-level releases for FY2022, not tied to this contract

Camarines Sur 4th DEO · SARO 1,577 (₱362,967,860,598.00) · NCA 828 (₱622,683,863,078.47)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

134 projects · ₱5.3B total · 0 flags

Other projects by this contractor

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-BASIC INFRASTRUCTURE PROGRAM (BIP)-BIP-FLOOD MITIGATION STRUCTURES PROTECTING MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-CONSTRUCTION OF FLOOD MITIGATION STRUCTURE, BARANGAY GUINACUTAN, VINZONS, CAMARINES NORTE, VI

Region V, Region V

2024₱198.0M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING PRIMARY ROADS, DAANG MAHARLIKA, K0251+800.00-K0251+887.00; K0251+1048-K0252+700.00; K0252+750.00-K0254+040.00, CAMARINES NORTE

Region V, Region V

2019₱115.8M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINK/NEW ROAD,LALUD - GARCHITORENA ROAD STA.5+713.73 - STA.10+809.63 LAGONOY, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2020₱106.1M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MISSING LINK/NEW ROAD,(P00402351LZ)LAGONOY-CARAMOAN ROAD SECTION 1: STA.4+390.90 - STA.6+327.41 SECTION 2: STA.7+640.90 - STA.8+204.39 LAGONOY SECTION, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2020₱100.8M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-ROAD WIDENING-PRIMARY ROADS-MAHARLIKA HIGHWAY-K0277+000-K0278+956, K0278+994-K0279+225, LABO, CAMARINES NORTE (1ST LEGISLATIVE DISTRICT)

Region V, Region V

2025₱100.2M
Past target date (DPWH On-Going)
No sat.

REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS ALONG TIGAON-GOA-SAN JOSE-LAGONOY-GUIJALO VIA SAN VICENTE ROAD K0573+089.00 - K0575+000.00; K0575+233.00 - K0575+522.00; K0575+522.00 - K0575+824.00; K0575+895.00 - K0576+1120.00 CARAMOAN, CAMARINES SUR

Camarines Sur 4th DEO, Region V

2024₱96.5M
Reported complete (DPWH)
View all 134 projects →

4. Implementation

Contract Amount

₱91,675,000.00

Progress

Reported complete (DPWH)

Start Date

March 24, 2022

Target End

July 10, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurLagonoyDel Carmen
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.