GAA 2025 SSP25BI0108

BASIC INFRASTRUCTURE PROGRAM (BIP) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL RESILIENCE PROGRAM - CONSTRUCTION OF MULTI- PURPOSE BUILDING DEPED, BAYOMBONG, DIVISION OFFICE, BAYOMBONG, NUEVA VIZCAYA

BASIC INFRASTRUCTURE PROGRAM (BIP) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL RESILIENCE PROGRAM - CONSTRUCTION OF MULTI- PURPOSE BUILDING DEPED, BAYOMBONG, DIVISION OFFICE, BAYOMBONG, NUEVA VIZCAYA is a DPWH-tracked public work in Nueva Vizcaya DEO, Region II. Reported contract value: ₱28,806,020.00. Status: Past target date (DPWH On-Going). Contractor on record: IRC CONST. Figures trace to dpwh.

Nueva Vizcaya DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱40,000 (shared by many projects, not this project's own line)

    Possible match · score 0.84

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱28,806,020 · IRC CONSTRUCTION AND SUPPLIES

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    9% reported · imagery 2024-08-07 → 2024-08-07

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BASIC INFRASTRUCTURE PROGRAM (BIP) MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES STRUCTURAL RESILIENCE PROGRAM - CONSTRUCTION OF MULTI- PURPOSE BUILDING DEPED, BAYOMBONG, DIVISION OFFICE, BAYOMBONG, NUEVA VIZCAYA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 84%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Rehabilitation of Flood Control Structure along Magat River, Magapuy, Bayombong, Nueva Vizcaya
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Nueva Vizcaya DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

4. Implementation

Contract Amount

₱28,806,020.00

Progress

Past target date (DPWH On-Going)

Start Date

July 21, 2025

Target End

July 11, 2026

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)Nueva VizcayaBayombongDon Tomas Maddela Pob.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.