GAA 2025 CP25PF0035

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) GUINZADAN-CAGUBATAN-BALILI (MANKAYAN) ROAD LEADING TO MOGAO MOUNTAIN AND GAWAAN LAKE, MANKAYAN, BENGUET

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) GUINZADAN-CAGUBATAN-BALILI (MANKAYAN) ROAD LEADING TO MOGAO MOUNTAIN AND GAWAAN LAKE, MANKAYAN, BENGUET is a DPWH-tracked public work in Benguet 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱9,700,059.50. Status: Past target date (DPWH On-Going). Contractor on record: LAYAD GEN ENGINEERING CONST AND AGGREGATES. Figures trace to dpwh.

Benguet 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2025 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25PF0035 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    76% reported · imagery 2023-02-10 → 2023-02-10

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP) GUINZADAN-CAGUBATAN-BALILI (MANKAYAN) ROAD LEADING TO MOGAO MOUNTAIN AND GAWAAN LAKE, MANKAYAN, BENGUET

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Structure, Sebang Communal Irrigation System (CIS), Buguias, Benguet
GAA fiscal year
FY2025
DBM GAA source document

2. Allotment

Agency-level releases for FY2025, not tied to this contract

Benguet 2nd DEO · SARO 1,540 (₱654,314,185,039.00) · NCA 1,270 (₱735,120,377,953.60)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

23 projects · ₱210.0M total · 0 flags

Other projects by this contractor

No sat.

Construction of Balili Flood Control Sta. 1+429 - 1+698 (L.S.), Sta 1+445 - Sta 1+698 (R.S.), Sta 1+711 - Sta 1+849 (L.S.), Sta 1+727 - Sta 1+803 (R.S.), Mankayan, Benguet

BENGUET, Cordillera Administrative Region

2021₱29.4M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS: MANGKINGAO - AM-AM VIA MASCA-SAYAPOT ROAD LEADING TO AM-AM OBSERVATORY ROCK, BURIAL CAVE, CADA FARM AND KENNY FARM, MANKAYAN, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2024₱17.8M
Reported complete (DPWH)
No sat.

Construction of Baguyos CIS Flood Control Structure along Baguyos Creek, Mankayan, Benguet

MANKAYAN (BENGUET), BENGUET, Cordillera Administrative Region

2024₱14.7M
Reported complete (DPWH)
No sat.

IMPROVEMENT OF AM-AM TOURISM ROAD, JUNCTION TO SALIN, PANGGA - BALICANO, BARANGAY BALILI FMR, BARANGAY BALILI, MANKAYAN, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2021₱11.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD ALONG LUSONG VIA MACUTANG - DAGADAG-CABACAB ACCESS ROAD, BRGY. BALILI, MANKAYAN, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2023₱9.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES: TABIO-BEDBED-BAGUINGEY-SAYAPOT ROAD IN SUPPORT OF COFFEE, BAMBOO, FOOD AND FEED CROPS, PLANTATION CROPS, CUTFLOWERS AND FRUIT TREES INDUSTRIES, MANKAYAN, BENGUET

Benguet 2nd DEO, Cordillera Administrative Region

2025₱9.8M
Reported complete (100% progress, DPWH status On-Going)
View all 23 projects →

4. Implementation

Contract Amount

₱9,700,059.50

Progress

Past target date (DPWH On-Going)

Start Date

April 8, 2025

Target End

October 4, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)BenguetMankayanBalili
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.