Bridges21DB0015

BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LAGUILE BR. (B04714LZ) ALONG LEMERY-TAAL DIVERSION ROAD

BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LAGUILE BR. (B04714LZ) ALONG LEMERY-TAAL DIVERSION ROAD is a DPWH-tracked public work in Batangas 1st DEO, Region IV-A. Reported contract value: ₱18,058,196.10. Status: Reported complete (DPWH). Contractor on record: FRANDEL CONST AND DEVELOPMENT CORP. Figures trace to dpwh.

Batangas 1st DEO, Region IV-A
Region: Region IV-A

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱50,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21DB0015 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2017-06-02 → 2025-10-06

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: BRIDGE-RETROFITTING/STRENGTHENING OF PERMANENT BRIDGES-LAGUILE BR. (B04714LZ) ALONG LEMERY-TAAL DIVERSION ROAD

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱50,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control Mabini, Batangas Circumferential Road
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Batangas 1st DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

61 projects · ₱2.2B total · 0 flags

Other projects by this contractor

No sat.

FY 2022 DPWH INFRASTRUCTURE PROGRAMORGANIZATIONAL OUTCOME 1:ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEMNETWORK DEVELOPMENT PROGRAMCONSTRUCTION OF BY-PASS AND DIVERSION ROADS LIPA CITY - PADRE GARCIA DIVERSION ROAD, PACKAGE J, BATANGAS

Region IV-A, Region IV-A

2022₱144.7M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CATANDALA BRIDGE WITH ROA

Batangas 4th DEO, Region IV-A

2023₱96.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG), ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES, CONSTRUCTION OF CATANDALA BRIDGE, IBAAN,

Batangas 4th DEO, Region IV-A

2023₱93.6M
Reported complete (DPWH)
No sat.

ORG OUTCOME 2 : PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MGMT PROGRAM-CONSTRUCTION/ MAINT OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYS- CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG BINAMBANG RIVER (UPSTREAM L/S), BALAYAN, BATANGAS

Batangas 1st DEO, Region IV-A

2025₱93.6M
Ongoing (DPWH-reported)
No sat.

ORGANIZATIONAL OUTCOME 2 : PROTECT LIVES AND PROPERTIES AGAINST MAJOR FLOODS - FLOOD MANAGEMENT PROGRAM - CONSTRUCTION/ MAINTENANCE OF FLOOD MITIGATION STRUCTURES AND DRAINAGE SYSTEMS - CONSTRUCTION OF SLOPE PROTECTION STRUCTURE AT LIAN, BATANGAS

Batangas 1st DEO, Region IV-A

2025₱93.6M
Past target date (DPWH On-Going)
No sat.

ORGANIZATIONAL OUTCOME 2:PROTECT LIVES & PROPERTIES AGAINST MAJ FLOODS-FLOOD MANAGEMENT PROG-CONST/REHAB OF FLOOD MITIGATION FAC W/ IN MAJ RIVER BASINS & PRINCIPAL RIVERS-CONSTRUCTION OF RIVERBANK PROTECTION STRUCTURE ALONG PANSIPIT RIVER,LEMERY,BATANGAS

Batangas 1st DEO, Region IV-A

2025₱93.6M
Past target date (DPWH On-Going)
View all 61 projects →

4. Implementation

Contract Amount

₱18,058,196.10

Progress

Reported complete (DPWH)

Start Date

February 11, 2021

Target End

July 10, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)BatangasLemeryAyao-iyao
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Storm surgeDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.