Roads22P00080

MT. PROV - CAGAYAN VIA TABUK - ENRILE RD - KO406+340 - KO406+445SADANGA, MT. PROVINCE

MT. PROV - CAGAYAN VIA TABUK - ENRILE RD - KO406+340 - KO406+445SADANGA, MT. PROVINCE is a DPWH-tracked public work in Cordillera Administrative Region, Cordillera Administrative Region. Reported contract value: ₱144,750,000.00. Status: Reported complete (DPWH). Contractor on record: MG SAMIDAN CONST. Figures trace to dpwh.

Cordillera Administrative Region, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 22P00080 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2021-05-06 → 2023-07-09

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: MT. PROV - CAGAYAN VIA TABUK - ENRILE RD - KO406+340 - KO406+445SADANGA, MT. PROVINCE

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2022 GAA. DBM GAA FY2022

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

D

533 projects · ₱51.8B total · 52 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - NETWORK DEVELOPMENT PROGRAM: CONSTRUCTION OF MISSING LINKS/NEW ROADS BAGUIO - LA TRINIDAD - ITOGON - SABLAN TUBA AND TUBLAY, KAMOG JCT. - CALOT - PAPPA - BAGONG - BALLUAY - TUEL JCT

Cordillera Administrative Region, Cordillera Administrative Region

2022₱289.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS ITOGON - DALUPIRIP - SN MANUEL BDRY ROADKO275+510 -

Cordillera Administrative Region, Cordillera Administrative Region

2021₱279.9M
Reported complete (DPWH)
No sat.

BAGUIO - BONTOC RD - KO347+520 - KO347+577BAUKO, MT. PROVINCE

Cordillera Administrative Region, Cordillera Administrative Region

2022₱241.3M
Reported complete (DPWH)
No sat.

SPECIAL ROAD PROJECT - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239, INSTALLATION OF ROAD SAFETY DEVICES ALONG A. SN FERNANDO AIRPORT RD - K0265 + (-273)-K0265 + (-128) - K0266 + 828-K0267 + 015, BARANGAY PAGDALAGAN. BARANGAY SAN VICENTE, BARANGAY

Region I, Region I

2023₱241.2M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SPECIAL ROAD FUND - MOTOR VEHICLE USER'S CHARGE (MVUC) AS PER R.A. 11239 - PREVENTIVE MAINTENANCE (ASPHALT OVERLAY) ALONG GOV. BADO DANGWA NATIONAL RD (S00377LZ) KO328+(-085) - KO329+420, (S00376LZ) KO320+100 - KO3

Cordillera Administrative Region, Cordillera Administrative Region

2022₱212.3M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF ROAD, CAMP 1 - TABAAN SUR - TABAAN NORTE - TALOY SUR ROAD TO MARCOS HIGHWAY, TUBA, BENGUET

Cordillera Administrative Region, Cordillera Administrative Region

2022₱212.3M
Reported complete (DPWH)
View all 533 projects →

4. Implementation

Contract Amount

₱144,750,000.00

Progress

Reported complete (DPWH)

Start Date

August 9, 2022

Target End

November 24, 2023

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)Mountain ProvinceSadangaAnabel
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
LandslideDetails in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.