Buildings and Facilities16DC0099No coordinates published by DPWH

CY 2016 BASIC EDUCATIONAL FACILITIES FUND (CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS) BATCH 7, C

CY 2016 BASIC EDUCATIONAL FACILITIES FUND (CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS) BATCH 7, C is a DPWH-tracked public work in Batangas 3rd DEO, Region IV-A. Reported contract value: ₱6,090,000.00. Status: Reported complete (DPWH). Contractor on record: JERIS CONST AND SUPPLY. Figures trace to dpwh.

Batangas 3rd DEO, Region IV-A

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region IV-A

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱20,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-NCR-16-0013776 · ₱2,740,823 · release to the district office, not itemized per project

    Possible match · score 0.59

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16DC0099 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CY 2016 BASIC EDUCATIONAL FACILITIES FUND (CONSTRUCTION OF SENIOR HIGH SCHOOL CLASSROOMS) BATCH 7, C

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱20,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Repair/Maintenance of Flood Control Project along San Juan Laiya Road, Putingbuhangin, Nagsaulay Section, Batangas City
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-NCR-16-0013776

₱2,740,823.00 · FY2016

Released to Golden Acres National High School (Las Piñas NaTo c (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

A

153 projects · ₱852.3M total · 0 flags

Other projects by this contractor

No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM, CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, TANAUAN CITY-STO. TOMAS DIVERSION ROAD VIA SAMPALOCAN ROAD, BATANGAS

Batangas 3rd DEO, Region IV-A

2025₱67.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM - TRIP), SAN PEDRO - STA. CRUZ ECOTOURISM ROAD LEADING TO NATIONAL SHRINE OF ST. PADRE PIO, ST

Batangas 3rd DEO, Region IV-A

2023₱49.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF CLASSROOMS BATCH 1, FOUR STOREY TWENTY CLASSROOM, MALVAR NATIONAL HIGH SCHOOL, MALVA

Batangas 3rd DEO, Region IV-A

2018₱44.8M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM, CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS, SAN PEDRO-STA. CRUZ ECOTOURISM ROAD LEADING TO NATIONAL SHRINE OF ST. PADRE PIO, STO. TOMAS, BATANGAS

Batangas 3rd DEO, Region IV-A

2020₱41.5M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT PROGRAM - ROAD WIDENING - TERTIARY ROADS, TALISAY-LAUREL-AGONCILLO RD

Batangas 3rd DEO, Region IV-A

2022₱34.3M
Reported complete (DPWH)
No sat.

ORGANIZATIONAL OUTCOME 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM, NETWORK DEVELOPMENT - ROAD WIDENIND - TERTIARY ROADS, LIPA - BALETE RD

Batangas 3rd DEO, Region IV-A

2021₱28.2M
Reported complete (DPWH)
View all 153 projects →

4. Implementation

Contract Amount

₱6,090,000.00

Progress

Reported complete (DPWH)

Start Date

August 10, 2016

Target End

December 7, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region IV-A (CALABARZON)Batangas
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.