Roads21FL0009

CONST/IMPRVT OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATION (TOURIST ROAD INFRA PROGRAM - TRI

CONST/IMPRVT OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATION (TOURIST ROAD INFRA PROGRAM - TRI is a DPWH-tracked public work in Sorsogon 2nd DEO, Region V. Reported contract value: ₱47,272,205.33. Status: Reported complete (DPWH). Contractor on record: AREMAR CONST CORP. Figures trace to dpwh.

Sorsogon 2nd DEO, Region V
Region: Region V

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2021 · ₱11,550 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 21FL0009 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2020-04-13 → 2022-06-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST/IMPRVT OF ACCESS RDS LEADING TO DECLARED TOURISM DESTINATION (TOURIST ROAD INFRA PROGRAM - TRI

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱11,550,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control, Brgy. Culasi, Matnog, Sorsogon
GAA fiscal year
FY2021
DBM GAA source document

2. Allotment

Agency-level releases for FY2021, not tied to this contract

Sorsogon 2nd DEO · SARO 1,294 (₱130,951,870,166.00) · NCA 1,353 (₱701,960,015,999.00)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

161 projects · ₱12.0B total · 2 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-ASSET PRESERVATION PROGRAM-PREVENTIVE MAINTENANCE-PRIMARY ROADS-DAANG MAHARLIKA(LZ), SECTION C:K0585+431-K0588+170.00 (W/ EQUATIONS);SECTION D: SECTION D:K0588+370.00-K0590+181.00(W/ EQUATIONS); SECTION E

Region V, Region V

2018₱289.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CLUSTER II:I-BARCELONA-CASIGURAN DIVERSION ROAD,BARCELONA SECTION,SORSOGON;II-JUBAN-BULAN DIVERSION ROAD,BULAN SECTION,SORSOGON;III-

Region V, Region V

2021₱241.9M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-CLUSTER I-I-SORSOGON CITY COASTAL BYPASS ROAD, PACKAGE 7, SORSOGON;II-SORSOGON CITY COASTAL BYPASS ROAD, PACKAGE 8, SORSOGON, SORSOG

Region V, Region V

2021₱211.5M
Reported complete (DPWH)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM-CONSTRUCTION OF BY-PASS AND DIVERSION ROADS, SORSOGON CITY COASTAL BY-PASS ROAD, PACKAGE 6, SORSOGON, SORSOGON CITY, SORSOGON (1ST LEGISLATIVE DISTRICT)

Region V, Region V

2020₱193.0M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BALOGO SPORT COMPLEX SORSOGON CITY

Sorsogon DEO, Region V

2020₱192.7M
Reported complete (DPWH)
No sat.

ORGANIZAL OUTCOM 1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM-NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-SORSOGON CITY COASTAL BYPASS ROAD, PACKAGE 19, SORSOGON

Sorsogon DEO, Region V

2025₱141.4M
Past target date (DPWH On-Going)
View all 161 projects →

4. Implementation

Contract Amount

₱47,272,205.33

Progress

Reported complete (DPWH)

Start Date

March 5, 2021

Target End

October 13, 2021

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)SorsogonBulusanTinampo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.