Bridges16BE0076

CONST'N & MAINTENANCE OF BRIDGES ALONG NAT'L RDS., REPLACEMENT OF PERMANENT WEAK BRIDGES, AGA BRIDGE 1 ALONG ILAGAN-DELFIN ALBANO-MALLIG RD., DELFIN ALBANO, ISABELA

CONST'N & MAINTENANCE OF BRIDGES ALONG NAT'L RDS., REPLACEMENT OF PERMANENT WEAK BRIDGES, AGA BRIDGE 1 ALONG ILAGAN-DELFIN ALBANO-MALLIG RD., DELFIN ALBANO, ISABELA is a DPWH-tracked public work in Isabela 1st DEO, Region II. Reported contract value: ₱28,517,862.86. Status: Reported complete (DPWH). Contractor on record: DRAGON TWELVE BUILDERS & CONST SUPPLY. Figures trace to dpwh.

Isabela 1st DEO, Region II
Region: Region II

Follow the peso

1 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2016 · ₱32,000 (shared by many projects, not this project's own line)

    Possible match · score 0.80

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-BMB-A-16-0003828 · · release to the district office, not itemized per project

    Possible match · score 0.66

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 16BE0076 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-04-13 → 2025-05-20

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST'N & MAINTENANCE OF BRIDGES ALONG NAT'L RDS., REPLACEMENT OF PERMANENT WEAK BRIDGES, AGA BRIDGE 1 ALONG ILAGAN-DELFIN ALBANO-MALLIG RD., DELFIN ALBANO, ISABELA

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 80%

UACS
18001
Amount
₱32,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction / Rehabilitation of Flood Control Structures, Dalibubon Bridge Approach A, Isabela 4th LD
GAA fiscal year
FY2016
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-BMB-A-16-0003828

₱-11,176,723,257.00 · FY2016

Released to Central Office (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

56 projects · ₱4.1B total · 18 flags

Other projects by this contractor

No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM: BRIDGE PROGRAM - WIDENING OF PERMANENT BRIDGES - MALALAM BR. (B01121LZ) ALONG MAHARLIKA HIGHWAY

Region II, Region II

2025₱253.5M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ILAGAN-DIVILACAN ROAD, IL

Region II, Region II

2024₱192.8M
Past target date (DPWH On-Going)
No sat.

OO1: ENSURE SAFE AND RELIABLE NATIONAL ROAD: BRIDGE - WIDENING OF PERMANENT BRIDGES - ARCON BRIDGE (B01130LZ) ALONG DAANG MAHARLIKA (LZ)

Region II, Region II

2022₱155.1M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM -SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES -CONSTRUCTION OF ILAGAN-DIVILACAN ROAD, P

Isabela 1st DEO, Region II

2025₱144.7M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM- SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/ STRATEGIC PUBLIC BUILDINGS/ FACILITIES- CONSTRUCTION OF ILAGAN-DIVILACAN ROAD, P

Isabela 1st DEO, Region II

2025₱144.7M
Past target date (DPWH On-Going)

Construction of Slope Protection Works for Cagayan River Basin, Cagayan River, Santa Maria, Isabela

SANTA MARIA (ISABELA), ISABELA, Region II

2024₱144.7M
Reported complete (DPWH)
View all 56 projects →

4. Implementation

Contract Amount

₱28,517,862.86

Progress

Reported complete (DPWH)

Start Date

June 1, 2016

Target End

March 27, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)IsabelaDelfin AlbanoAga
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Dry conditions likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.