Buildings and Facilities18BD0126

CONSTRUCTION OF THREE(3) STOREY TWELVE (12) CLASSROOM TWO (2) CLASSROOM SCIENCE LABORATORY/TWO (2) CLASSROOM REGULAR WORKSHOP AND TWO (2) ICT, CABBO NATIONAL HIGH SCHOOL, PEÑABLANCA, CAGAYAN

CONSTRUCTION OF THREE(3) STOREY TWELVE (12) CLASSROOM TWO (2) CLASSROOM SCIENCE LABORATORY/TWO (2) CLASSROOM REGULAR WORKSHOP AND TWO (2) ICT, CABBO NATIONAL HIGH SCHOOL, PEÑABLANCA, CAGAYAN is a DPWH-tracked public work in Cagayan 3rd DEO, Region II. Reported contract value: ₱27,372,986.75. Status: Reported complete (DPWH). Contractor on record: CSD ENGINEERING AND CONST. Figures trace to dpwh.

Cagayan 3rd DEO, Region II
Region: Region II

Follow the peso

2 of 5 steps linked to this project, 2 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2018 · ₱30,000 (shared by many projects, not this project's own line)

    Possible match · score 0.83

    DBM GAA source ↗
  2. 2. SARO / NCA release

    NCA NCA-ROII-18-0002813 · ₱6,117,152 · release to the district office, not itemized per project

    Possible match · score 0.80

    DBM release source ↗
  3. 3. PhilGEPS award

    ₱27,372,987 · CSD ENGINEERING AND CONSTRUCTION

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-02-13 → 2022-11-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF THREE(3) STOREY TWELVE (12) CLASSROOM TWO (2) CLASSROOM SCIENCE LABORATORY/TWO (2) CLASSROOM REGULAR WORKSHOP  AND TWO (2) ICT, CABBO NATIONAL HIGH SCHOOL, PEÑABLANCA, CAGAYAN

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 83%

UACS
18001
Amount
₱30,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Flood Control System (Downstream), Natappian, Solana, Cagayan
GAA fiscal year
FY2018
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

NCA NCA-ROII-18-0002813

₱6,117,152.00 · FY2018

Released to Regional Office - II (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM NCA listing (source)

3. Procurement & Award

Confirmed (exact contract ID) · 100%

Construction of Three (3) Storey Twelve (12) Class

₱27,372,986.75 · CSD ENGINEERING AND CONSTRUCTION

Award / contract ref: 18BD0126-RE-AD

Contractor

B

31 projects · ₱216.3M total · 0 flags

Other projects by this contractor

View all 31 projects →

4. Implementation

Contract Amount

₱27,372,986.75

Progress

Reported complete (DPWH)

Start Date

August 15, 2018

Target End

March 22, 2019

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region II (Cagayan Valley)CagayanPeñablancaCabbo
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.