Roads17FD0024No coordinates published by DPWH

CONST./REHAB. OF LOCAL ROADS AT BRGY. CABUGAO AND BRGY. STO. DOMINGO, MILAOR, CAMARINES SUR

CONST./REHAB. OF LOCAL ROADS AT BRGY. CABUGAO AND BRGY. STO. DOMINGO, MILAOR, CAMARINES SUR is a DPWH-tracked public work in Camarines Sur 2nd DEO, Region V. Reported contract value: ₱2,820,918.01. Status: Reported complete (DPWH). Contractor on record: KCS CONST. Figures trace to dpwh.

Camarines Sur 2nd DEO, Region V

DPWH did not publish coordinates for this project. Location estimated from the project title (town level only); satellite images may not show the exact site.

Region: Region V

No before/after satellite images: DPWH did not publish coordinates, and the location estimated from the project title is only town level, which is not confident enough to image.

Follow the peso

2 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    FY2017 · ₱40,000

    Probable match · score 0.85

    DBM GAA source ↗
  2. 2. SARO / NCA release

    SARO SARO-ROV-17-0010836 · ₱277,253 · release to the district office, not itemized per project

    Possible match · score 0.64

    DBM release source ↗
  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17FD0024 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONST./REHAB. OF LOCAL ROADS AT BRGY. CABUGAO AND BRGY. STO. DOMINGO, MILAOR, CAMARINES SUR

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Probable match · score 85%

UACS
18001
Amount
₱40,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction/Rehabilitation/Improvement of Canaman Flood Control, Brgy. Manggayawan, Canaman, Camarines Sur
GAA fiscal year
FY2017
DBM GAA source document

2. Allotment

Office-level release, not tied to this specific contract

SARO SARO-ROV-17-0010836

₱277,253.00 · FY2017

Released to Salvacion National High School - Bato (office-level, not project-specific). This SARO/NCA funds the office's programme; DBM listings do not tie it to this contract.

DBM SARO listing (source)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

42 projects · ₱1.1B total · 0 flags

Other projects by this contractor

No sat.

002;CONST. /MAINT. OF FLOOD MITIGATION STRUCTURES & DRAINAGE SYSTEM-CONST. OF FLOOD MITIGATION STRUCTURE AT BRGY. SAN BERNARDINO CALABANGA CAMARINES SUR

Camarines Sur 3rd DEO, Region V

2024₱95.5M
Past target date (DPWH On-Going)
No sat.

CONVERGENCE AND SPECIAL SUPPORT PROGRAM-CONSTRUCTION/IMPROVEMENT OF ACCESS ROADS LEADING TO DECLARED TOURISM DESTINATIONS (TOURISM ROAD INFRASTRUCTURE PROGRAM-TRIP)-VIRAC-BATO-BATALAY-BOTE-BITAOGAN-CARORIAN-CAGRARAY-RADAR STATION ROADS LEADING TO MARIBINA

Region V, Region V

2025₱82.0M
Past target date (DPWH On-Going)
No sat.

SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BALATAN, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2022₱77.2M
Reported complete (DPWH)
No sat.

CSSP: SUSTAINABLE INFRASTRUCTURE PROJECTS ALLEVIATING GAPS (SIPAG) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/ FACILITIES - CONSTRUCTION OF BAGOLADIO SUBURBAN ROAD, BULA, CAMARINES SUR

Camarines Sur 5th DEO, Region V

2023₱72.0M
Reported complete (DPWH)
No sat.

OO1: NETWORK DEVELOPMENT PROGRAM - CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-MILAOR-PILI BYPASS ROAD, PACKAGE 1, CAMARINES SUR

Camarines Sur 2nd DEO, Region V

2022₱70.9M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF BY-PASS AND DIVERSION ROADS-MILAOR-PILI BYPASS ROAD, CAMARINES SUR

Camarines Sur 2nd DEO, Region V

2018₱47.5M
Reported complete (DPWH)
View all 42 projects →

4. Implementation

Contract Amount

₱2,820,918.01

Progress

Reported complete (DPWH)

Start Date

July 7, 2017

Target End

August 5, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region V (Bicol Region)Camarines SurMilaor
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
Drought / dry spell likelyPAGASA · 2026-10-07El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.