Water Provision and Storage17P00062

CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE & SEWERAGE/RAINWATER COLLECTION SYSTEM (RWCS)-CY 2017

CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE & SEWERAGE/RAINWATER COLLECTION SYSTEM (RWCS)-CY 2017 is a DPWH-tracked public work in Cordillera Administrative Region, Cordillera Administrative Region. Reported contract value: ₱3,215,831.98. Status: Reported complete (DPWH). Contractor on record: CAD-ERA DESIGN AND BUILDER. Figures trace to dpwh.

Cordillera Administrative Region, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 17P00062 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · imagery 2016-12-23 → 2025-10-01

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE & SEWERAGE/RAINWATER COLLECTION SYSTEM (RWCS)-CY 2017

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2017 GAA. DBM GAA FY2017

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Possible match · 77%

15P00040 Renovation of Maintenance & Construction

₱5,075,471.38 · CAD-ERA DESIGN AND BUILDER

Possible match · 72%

21P00099 Repair / Maintenance of DPWH - CAR Annex

₱2,996,371.52 · CAD-ERA DESIGN AND BUILDER

Contractor

B

10 projects · ₱150.6M total · 0 flags

Other projects by this contractor

No sat.

CONSTRUCTION OF EVACUATION CENTER AT LIWAN WEST, RIZAL, KALINGA

Lower Kalinga DEO, Cordillera Administrative Region

2021₱35.7M
Reported complete (DPWH)
No sat.

NATIONAL BUILDING PROGRAM - MULTIPURPOSE/FACILITIES-STRUCTURAL IMPROVEMENT OF PUBLIC BUILDINGS AND EVACUATION CENTERS/QUARANTINE FACILITIES - CAR CONSTRUCTION OF EVACUATION CENTER AT UBAO, AGUINALDO, IFUGAO

Ifugao 2nd DEO, Cordillera Administrative Region

2021₱35.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION OF MULTI-PURPOSE BUILDING AT ALEJO PACALSO MEMORIAL HIGH SCHOOL, TUDING, ITOGON, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2022₱24.5M
Reported complete (DPWH)
No sat.

CONSTRUCTION/REHABILITATION OF ACCESSIBILITY FACILITIES FOR PHYSICALLY CHALLENGED PERSONS 1.HYDRO. #3, NANGALISAN, TUBA 2. PENGED, NANGALISAN, TUBA, 3. CAMP 6, DPWH-TOLLGATE, TUBA 4. CAMP 4 DPWH-FIELD CAMP, TUBA, 5. COLORADO FALLS, TWIN PEAKS, TUBA 6.TWIN

Cordillera Administrative Region, Cordillera Administrative Region

2018₱17.2M
Reported complete (DPWH)
No sat.

CONSTRUCTION/ REHABILITATION OF FLOOD MITIGATION FACILITIES WITHIN MAJOR RIVER BASINS AND PRINCIPAL RIVERS: CONSTRUCTION OF FLOOD MITIGATION STRUCTURE ALONG ARINGAY RIVER BASIN, ASIN PROPER-LUCEB SECTION, TUBA, BENGUET

Benguet 1st DEO, Cordillera Administrative Region

2020₱16.4M
Reported complete (DPWH)
No sat.

BASIC EDUCATION FACILITIES FUND (BEFF) BATCH 13-CONSTRUCTION OF 4-STOREY, 8 CLASSROOMS, QUEZON HILL NATIONAL HIGH SCHOOL, BAGUIO CITY

Baguio City DEO, Cordillera Administrative Region

2017₱11.4M
Reported complete (DPWH)
View all 10 projects →

4. Implementation

Contract Amount

₱3,215,831.98

Progress

Reported complete (DPWH)

Start Date

July 4, 2017

Target End

October 1, 2017

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)City of BaguioNew Lucban
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.