Roads24PC0091

CONCRETING OF SITIO AMKILAND, BRGY. SWAN FMR, BRGY. SWAN, PUDTOL, APAYAO

CONCRETING OF SITIO AMKILAND, BRGY. SWAN FMR, BRGY. SWAN, PUDTOL, APAYAO is a DPWH-tracked public work in Apayao 2nd DEO, Cordillera Administrative Region. Reported contract value: ₱19,893,577.88. Status: Past target date (DPWH On-Going). Contractor on record: HIGH LAND CONST SERVICES. Figures trace to dpwh.

Apayao 2nd DEO, Cordillera Administrative Region
Region: Cordillera Administrative Region

Follow the peso

1 of 5 steps linked to this project, 1 at office level only. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    District-office budget line, FY2024 · ₱15,000 (shared by many projects, not this project's own line)

    Possible match · score 0.82

    DBM GAA source ↗
  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 24PC0091 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    96% reported · imagery 2024-09-24 → 2024-09-24

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONCRETING OF SITIO AMKILAND, BRGY. SWAN FMR, BRGY. SWAN, PUDTOL, APAYAO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

Possible match · score 82%

UACS
18001
Amount
₱15,000,000.00 (GAA By-Object, amounts in ₱'000 × 1,000)
Program / description
Construction of Poblacion Flood Control Structure, Barangay Poblacion, Calanasan, Apayao
GAA fiscal year
FY2024
DBM GAA source document

2. Allotment

Agency-level releases for FY2024, not tied to this contract

Apayao 2nd DEO · SARO 1,917 (₱267,033,855,698.00) · NCA 1,287 (₱846,238,484,493.07)

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

C

6 projects · ₱63.9M total · 0 flags

Other projects by this contractor

No sat.

CONCRETING OF BRGY. POBLACION TO BRGY. SAN MARIANO FMR, BRGY. POBLACION AND BRGY. SAN MARIANO, PUDTOL, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2024₱14.9M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - APAYAO-ILOCOS NORTE RD - K0652 + 360 - K0652 + 410

Apayao 2nd DEO, Cordillera Administrative Region

2024₱11.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

CSSP-CONS/ IMPROVEMENT OF ACCESS ROADS LEADING TO TRADES, INDUSTRIES AND ECONOMIC ZONES (ROADS LEVERAGING LINKAGES FOR INDUSTRY & TRADE INFRASTRUCTURE PROG-ROLL-IT)-ANNINIPAN-PANTAY PANTAY RD IN SUPPORT OF RICE,CORN AND BANANA INDUSTRY, FLORA, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2025₱9.5M
Reported complete (100% progress, DPWH status On-Going)
No sat.

ORGANIZATIONAL OUTCOME 1 : ENSURE SAFE AND RELIABLE NATIONAL ROAD SYSTEM - ASSET PRESERVATION PROGRAM - REHABILITATION/ RECONSTRUCTION OF ROADS WITH SLIPS, SLOPE COLLAPSE, AND LANDSLIDE - TERTIARY ROADS - APAYAO-ILOCOS NORTE RD - K0659 + 050 - K0659 + 250

Apayao 2nd DEO, Cordillera Administrative Region

2024₱6.3M
Past target date (DPWH On-Going)
No sat.

CONSTRUCTION/REHABILITATION OF WATER SUPPLY/SEPTAGE AND SEWERAGE/RAIN WATER COLLECTORS, WATER SUPPLY SYSTEM - CONSTRUCTION (COMPLETION) OF WATER SYSTEM, BARANGAY AGA, PUDTOL, APAYAO

Apayao 2nd DEO, Cordillera Administrative Region

2024₱2.4M
Reported complete (100% progress, DPWH status On-Going)
View all 6 projects →

4. Implementation

Contract Amount

₱19,893,577.88

Progress

Past target date (DPWH On-Going)

Start Date

November 11, 2024

Target End

May 29, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Cordillera Administrative Region (CAR)ApayaoPudtolSwan
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.