Roads15M00091No coordinates published by DPWH

ROAD UPGRADING (UNPAVED TO PAVE) OF DIVERSION TO NORALA CONNECTING THE BARSA BIRD SANCTUARY MONTE VICENTEAU AND DECELA ECO PARK, K1692+100-K1695+600 NORALLAH, SOUTH COTABATO

ROAD UPGRADING (UNPAVED TO PAVE) OF DIVERSION TO NORALA CONNECTING THE BARSA BIRD SANCTUARY MONTE VICENTEAU AND DECELA ECO PARK, K1692+100-K1695+600 NORALLAH, SOUTH COTABATO is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱115,800,000.00. Status: Reported complete (DPWH). Contractor on record: GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON. Figures trace to dpwh.

Region XII, Region XII

DPWH did not publish coordinates for this project, so it cannot be placed on the map or checked with satellite images.

Region: Region XII

No before/after satellite images: DPWH has not published map coordinates for this project, so there is no location to image.

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 15M00091 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    100% reported · no satellite pair yet

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Unit-cost benchmark · Road, cost per km (new paving / upgrading)

₱33,085,714 per km= 1.1x the Region XII median (n=242)

Contract cost ₱115,800,000 ÷ 3.5 km read from the DPWH title (“K1692+100-K1695+600”; K-post / station range length). National percentile: 64. Higher unit cost can have legitimate causes (terrain, design, scope not stated in the title); this is a comparison, not a finding. Methodology

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: ROAD UPGRADING (UNPAVED TO PAVE) OF DIVERSION TO NORALA CONNECTING THE BARSA BIRD SANCTUARY MONTE VICENTEAU AND DECELA ECO PARK, K1692+100-K1695+600 NORALLAH, SOUTH COTABATO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2016 GAA. DBM GAA FY2016

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

296 projects · ₱27.9B total · 0 flags

4. Implementation

Contract Amount

₱115,800,000.00

Progress

Reported complete (DPWH)

Start Date

February 26, 2016

Target End

December 31, 2016

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Not yet linked to a PSGC area.
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.