Roads24K00434

INSTALLATION OF SOLAR LIGHTS ALONG MALABANG-DOBLESTON-TUKURAN ROAD-K1991+276-K1991+876

INSTALLATION OF SOLAR LIGHTS ALONG MALABANG-DOBLESTON-TUKURAN ROAD-K1991+276-K1991+876 is a DPWH-tracked public work in Region X, Region X. Reported contract value: ₱3,687,651.00. Status: Reported complete (100% progress, DPWH status On-Going). Contractor on record: U M D CONST. Figures trace to dpwh.

Region X, Region X
Region: Region X

Follow the peso

2 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    ₱3,687,651 · U M D CONST

    Confirmed (exact contract ID) · score 1.00

    PhilGEPS source ↗
  4. 4. DPWH progress + satellite

    100% reported · imagery 2022-01-31 → 2022-01-31

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: INSTALLATION OF SOLAR LIGHTS ALONG MALABANG-DOBLESTON-TUKURAN ROAD-K1991+276-K1991+876

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2024 GAA. DBM GAA FY2024

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

Confirmed (exact contract ID) · 100%

24K00434

₱3,687,651.00 · U M D CONST

Contractor

A

30 projects · ₱271.1M total · 0 flags

Other projects by this contractor

No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF LOCAL ROAD WITH SLOPE PROTECTION, BRGY. KOREO, SULTAN NAGA DIMAPORO, LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2024₱28.7M
Reported complete (100% progress, DPWH status On-Going)
No sat.

REHAB./RECONST./UPGRADING OF DAMAGED PAVED ROADS-PRIMARY ROADS MALABANG-DOBLESTON-TUKURAN RD - K1971 + 274 - K1972 + 240

Region X, Region X

2024₱28.0M
Reported complete (100% progress, DPWH status On-Going)
No sat.

BASIC INFRASTRUCTURE PROGRAM (BIP) - ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES - CONSTRUCTION OF ROAD, BARANGAY KOREO, SND, LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2024₱17.1M
Reported complete (DPWH)
No sat.

ASSET PRESERVATION PROGRAM - REHABILITATION/RECONSTRUCTION/UPGRADING OF DAMAGED PAVED ROADS - TERTIARY ROADS, DOBLESTON-BUTADON ROAD, K1997+000-K1997+270; K1997+504-K1997+661.50; K2002+579-K2002+597, SULTAN NAGA DIMAPORO, LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2023₱14.8M
Reported complete (DPWH)
No sat.

NETWORK DEVELOPMENT PROGRAM - OFF-CARRIAGEWAY IMPROVEMENT - PRIMARY ROADS MALABANG-DOBLESTON-TUKURAN ROAD, K1993+223

Lanao del Norte 2nd DEO, Region X

2023₱14.5M
Reported complete (DPWH)
No sat.

CONVERGENCE AND SPECIAL SUPPORT-BIP-ACCESS ROADS AND/OR BRIDGES FROM THE NATIONAL ROAD/S LEADING TO MAJOR/STRATEGIC PUBLIC BUILDINGS/FACILITIES-REHABILITATION OF POBLACION KAPATAGAN-SAN VICENTE-CATHEDRAL FALLS PROVINCIAL ROAD, KAPATAGAN LANAO DEL NORTE

Lanao del Norte 2nd DEO, Region X

2024₱14.3M
Reported complete (DPWH)
View all 30 projects →

4. Implementation

Contract Amount

₱3,687,651.00

Progress

Reported complete (100% progress, DPWH status On-Going)

Start Date

October 28, 2024

Target End

December 11, 2024

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region X (Northern Mindanao)Lanao del NorteSultan Naga DimaporoPikalawag
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
No medium/high hazard on the mapped layers.Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No PAGASA drought or dry flag for this province.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.