GAA 2025 OO-225M00181

CONSTRUCTION OF CONCRETE REVETMENT, DOWNSTREAM OF SINAWAL BRIDGE, SINAWAL RIVER, PHASE II, STA 0+000 - STA 0+307 (RIGHT BANK); STA 0+000 - STA 0+300 (LEFT BANK), BARANGAY LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO

CONSTRUCTION OF CONCRETE REVETMENT, DOWNSTREAM OF SINAWAL BRIDGE, SINAWAL RIVER, PHASE II, STA 0+000 - STA 0+307 (RIGHT BANK); STA 0+000 - STA 0+300 (LEFT BANK), BARANGAY LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO is a DPWH-tracked public work in Region XII, Region XII. Reported contract value: ₱112,281,213.67. Status: Past target date (DPWH On-Going). Contractor on record: GEMMA CONST SUPPLY INC FORMERLY:GEMMA CON. Figures trace to dpwh.

Region XII, Region XII
Region: Region XII

Follow the peso

1 of 5 steps linked to this project. Links are automated matches unless marked confirmed.

  1. 1. GAA budget line

    No GAA line found for this project's office and year. The GAA lists budgets by program and office, not always by project.

  2. 2. SARO / NCA release

    No SARO/NCA found for this office and year. DBM publishes releases by agency and office, rarely by project.

  3. 3. PhilGEPS award

    Not found in PhilGEPS by contract ID 25M00181 or title. The open PhilGEPS mirror does not include every DPWH notice.

  4. 4. DPWH progress + satellite

    91% reported · imagery 2019-05-15 → 2019-05-15

    Same record (DPWH contract ID)

    DPWH Transparency Portal source ↗
  5. 5. COA audit finding

    No COA finding names this project. COA audits DPWH by office each year; project-level findings are only linked when the report names the contract.

Been to this site?

Share a photo of what is there today. Faces and vehicle plates are blurred automatically, all photo metadata except the date and location is removed, and nothing is published until a moderator approves it.

Watch this project

Get a weekly email when this project changes: progress, new linked records or newly published anomaly flags.

Share card: CONSTRUCTION OF CONCRETE REVETMENT, DOWNSTREAM OF SINAWAL BRIDGE, SINAWAL RIVER, PHASE II, STA 0+000 - STA 0+307 (RIGHT BANK); STA 0+000 - STA 0+300 (LEFT BANK), BARANGAY LABANGAL, GENERAL SANTOS CITY, SOUTH COTABATO

Share this page

The card shows the public record facts and a QR code back to this page.

FacebookDownload image

Money Trail

1. Appropriation

No matching GAA line found for this project in the FY2025 GAA. DBM GAA FY2025

2. Allotment

No matching SARO/NCA release found for this project. Source: DBM SARO/NCA listings.

3. Procurement & Award

No PhilGEPS award linked in the link table for this contract yet.

Contractor

B

296 projects · ₱27.9B total · 0 flags

4. Implementation

Contract Amount

₱112,281,213.67

Progress

Past target date (DPWH On-Going)

Start Date

March 14, 2025

Target End

December 29, 2025

5. Audit

No COA audit observations linked to this project yet. See COA AAR sources.

Connected records

Where this project sits

Place (PSGC)
Region XII (SOCCSKSARGEN)City of General SantosLabangal
Storms whose wind field reached it
None on record (IBTrACS tracks).
Hazard exposure
Flood (100-yr rain)Details in Hazard context above.Full hazard check →
El Niño outlook (province)
No province on record.El Niño readiness →

Exposure to a storm, hazard or drought outlook is context, not a finding about the project.